Download Print this page

Canon LV-7250 Command Manual page 3

Lv2005_2006_com_list.pdf
Hide thumbs Also See for LV-7250:

Advertisement

(*2)
Data portion
Description
-----------------------------------------------------------------------
DATA01
Error type
DATA02
Error description
For more information, see "5. Data Portion of Response."
Supplement:
The projector does not accept the other command during power on
processing.
002. POWER OFF
**********************************************************************
Function:
This command switches off the main power of the projector.
Command:
02H 01H 00H 00H 00H 03H
Response (ACK): At the time of a success
22H 01H 01H xxH 00H CKS
(*2)
Response (NAK): At the time of a failure
A2H 01H 01H xxH 02H DATA01 DATA02 CKS
(*2)
Data portion
Description
-----------------------------------------------------------------------
DATA01
Error type
DATA02
Error description
For more information, see "5. Data Portion of Response."
Supplement:
-This command will fail during switching input signal. (NAK will be returned)
-The projector doesn't accept the other command during power
off processing.( It contains a cooling period.)
003. INPUT SELECT RGB(*5)
**********************************************************************
Function:
This command switches the input terminal to RGB(*5).
Command:
02H 03H 00H 00H 02H 01H <DATA01> CKS
Data Portion Contents
-------------------------------------------------------------------
DATA01
01H : RGB1(*5)
02H : RGB2(*5)(!)
(!)
LV-7240/7245/7250/7255 only
Response (ACK): At the time of a success
22H 03H 01H xxH 01H DATA01 CKS
(*2)
Data Portion Contents
-------------------------------------------------------------------
DATA01
Results
00H : Normal
FFH : Error (Signal select was not executed)
Response (NAK): At the time of a failure
A2H 03H 01H xxH 02H DATA01 DATA02 CKS
(*2)
(3)

Advertisement

loading

This manual is also suitable for:

Lv-x6Lv-7245Lv-7240Lv-x5Lv-7255