I
NSTALLATION OF
I
S
NSTALLATION
AFETY
If any installation problems are encountered, please call G&B Specialties for technical
assistance before continuing with the installation process.
Failure to heed to any of the following warnings could result in severe bodily
!
injury and/or equipment damage.
Read and understand this manual completely before attempting installation of
the equipment.
Installation instructions provided below only address the Rafna railgear
equipment. Applicable railway company procedures and policies must be
adhered to.
Before performing any work under the vehicle or railgear, ensure the engine is
turned off and the parking brake is set.
Beware of all pinch points on the railgear and keep all parts of the body clear.
When routing hydraulic hoses, ensure that the hoses do not contact any sharp
edges or hot surfaces.
When routing electrical wires, ensure that the wires do not contact any sharp
edges or hot surfaces.
All wire connections are to be soldered and heat shrink sealed to prevent
future corrosion related problems.
All wires must be covered with protective cable loom.
G&B Specialties Inc. 535 West 3
US Field Service: 570-441-6988; CAN Field Service 570-854-0482; www.rafna.com
R-230 H
YDRAULIC
STD C
ONTROLS W
P
RECAUTIONS
rd
Street, Berwick, PA, USA Tel: (570) 752-5901 Fax: (570) 752-6397
K
/ M
IT W
ANUAL
/ D
ETENT
-1-
MIO-H18S004270 Rev C
O
V
PERATING
ALVES
Need help?
Do you have a question about the R-230 and is the answer not in the manual?
Questions and answers