Cyberrow precision air conditioning units 380-415 v/3 ph/50 hz (86 pages)
Summary of Contents for Stulz SplitAir4
Page 1
SplitAir4 Original instructions Air Conditioners Index 39B Issue 10.2021...
Page 2
SX L - O R I G I N A L I N S T R U C T I O N S A B O U T S T U L Z Since it was founded in 1947, the STULZ company has evolved into one of the world’s leading system suppliers of air-conditioning technology.
Page 3
It's the result of decades of research and design studies, with a fine search of materials and technologies to obtain an high quality unit. The CE mark guarantees that the STULZ products satisfy the requirements of the European Machinery Directive for safety.
Page 6
11.11.Stainless steel casing - PAKIN ......................84 11.12.Seaworthy case packaging - SEAPACK ..................84 STULZ reserves the right to update the product and the relevant manual without having to update products and manuals sold previously except under exceptional circumstances. Contact your local STULZ partner when requesting or receiving any updates of instruction manuals or corrections when which are considered to be integral parts of the manual.
Page 7
It must not be considered unsuitable merely because it has not been updated following developments in design and manufacturing methods. STULZ reserves the right to update the product and the relevant manual without having to update products and manuals sold previously except under exceptional circumstances.
(i.e. gloves, glasses, helmet, shoes), according to the indications of safety manager and applicable regulations. • The unit may only be used to cool according to the STULZ specification. • Before any maintenance operation, read and follow instructions in the corresponding chapter.
Their use eliminates problems caused by high temperatures, dirt and humidity present in the area where they are installed. The units of SplitAir4 family are divided in two parts: the motor- condensing unit must be installed outside the room to be conditioned and it's designed to operate with compressor always in upright position.
3. Handling and storage 3.1. Unit receipt STULZ products are delivered ex-works. All units have been individually inspected in all their components and been carefully packaged before the delivery. Immediately inspect the unit upon receipt of the goods. • Make sure that it has been transported in the correct position. Note any unsuitable shipping conditions on the shipping document.
Page 20
With ex-works delivery conditions, carrier is the sole responsible for any damage caused during transport. STULZ is not responsible for damages to the goods caused by the carrier, but it will do everything in its power to assist clients on those situations.
Components of both circuits are connected together by copper piping, appropriately welded to ensure a greater seal. The two refrigerant circuits of SplitAir4 internal and external parts must be connected each other in order to realise a complete circuit. Copper piping between the two parts have to be provided by the installer.
The liquid receiver, positioned between the condenser and the condenser fan, it provides the required supply of liquid refrigerant and ensures maximum efficiency over varying operating conditions. The liquid receiver in SplitAir4 size 1 is 1,3 litres, while in SplitAir4 size 2 is 2,8 litres. 4.7.
Page 35
SEC.Blue I/O Controller There are two electronic boards in a SplitAir4: one in the internal unit and the other in the external unit. The microprocessor-based electronic board is equipped with a set of terminals which are necessary to connect the board to the controlled devices (e.g.
Page 49
• Fresh air intake opening: it must be made according to the dimensions of the terminal adaptor plates of connection ducts. In all the cases, this opening has to be protected by rainproof grilles (accessory ACTGRxxSAL). Cut out dimensions are 515x260 in SplitAir4 size 1 and 715x310 in SplitAir4 size 2.
6.2. Refrigerant connections In order to create a closed circuit, refrigerant pipes of SplitAir4 internal and external parts must be connected together. As a consequence, copper pipes for the two liquid and gas lines must be suitably installed and connected to both parts.
Page 54
SX L - O R I G I N A L I N S T R U C T I O N S SplitAir4 units are pre-filled with refrigerant. After connecting refrigerant circuits of both parts, it might be necessary to complete refrigerant charge. When the charge is completed, check if traces of oil are present on the internal or external part, indicating a probable loss of coolant.
SX L - O R I G I N A L I N S T R U C T I O N S INFORMATION If it's necessary to refill oil, please contact STULZ offices. 6.3. Condensate drain During the cooling cycle, part of the air humidity condenses on the evaporator. The condensate is collected in the tank under the heat exchanger and must be drained outside with a tube (not supplied by STULZ).
Page 64
The connecting cable is a pin-to-pin cable with RJ11 plug and it's not supplied with the unit, but available as STULZ accessory ACTSEQCxxM. To ground shielded cables, if any, use the insert near the connector of the outdoor unit (see image below).
Page 70
Spare filters must have filtering medium with the same thickness and density as the original one. A set of spare filters can be ordered to your local STULZ service partner. Replacing free cooling damper motor (if free cooling module is present) To replace the motor of the free cooling damper, unscrew the 2 fixing screws of the damper motor box on the right side of the free cooling module.
The following are the instructions for proper disposal of the unit during the various phases of its life. For further clarification or additional information, please contact info@stulz.it. INFORMATION To ensure proper and safe disposal activities, operator must equip themselves with the necessary PPE including: anti-cut gloves, oil resistant gloves, heat resistant gloves, safety footwear, safety eye-wear against liquid and gas splashes.
11.11. Stainless steel casing - PAKIN With this option external panel and fixing flanges of the units are made of stainless steel AISI 304. As standard, the unit are available in various colours. Contact Stulz office for more information. 11.12. Seaworthy case packaging - SEAPACK Wooden packaging with special treatment suitable for sea freight.
Page 85
Contáctanos Zapopan - Matriz Cancún - Centro de distribución Periferico 2507, interior 14 y 15. Av. Kabah Supermanzana #93 Sinergia Parque Logístico, Manzana 19 Lote 4-02Local B5 de Zapopan, Jalisco. Bodegas Kabah. 800 841 3730 800 890 0808 33 1654 1210 998 840 0937 Tijuana - Centro de distribución Culiacán- Centro de distribución...
Need help?
Do you have a question about the SplitAir4 and is the answer not in the manual?
Questions and answers