DREDGEPACK®
INSTALLATION MANUAL FOR TRAILING SUCTION HOPPER DREDGE
WITH SEATOOLS SYSTEM
Revision A, May 2025 
 
DREDGEPACK®

Advertisement

loading
Need help?

Need help?

Do you have a question about the HYPACK DREDGEPACK and is the answer not in the manual?

Questions and answers

Summary of Contents for Xylem HYPACK DREDGEPACK

  • Page 1     DREDGEPACK® DREDGEPACK® INSTALLATION MANUAL FOR TRAILING SUCTION HOPPER DREDGE WITH SEATOOLS SYSTEM Revision A, May 2025   ...
  • Page 2   DREDGEPACK® INSTALLATION MANUAL FOR TRAILING SUCTION  HOPPER DREDGES USING SEATOOLS SYSTEM  Thank you for your purchase of this Trailing Suction Hopper Dredge (TSHD) System.  Every effort has been made to ensure this system is ready for installation directly from  the case in which it has been shipped to you. All components have been bench tested for  complete  f unctionality of  t he  s ystem.  I t  i s  o ur desire  t o  p rovide  y ou with  t he best system  possible  a nd  t o  f ully  s upport  a ll  a spects  o f  y our  n ew  H YPACK  T SHD  S ystem. ...
  • Page 3   DREDGEPACK® Minimum Installation Required Checklist Use this checklist to ensure your equipment has been installed prior to the arrival of the HYPACK On-site Sup- port Technician to help maximize the time available for interfacing, calibration, and training. Hopper Dredges with Seatools System - Minimum Installation Required: The HYPACK On-site Support Technician will be in charge of the final connection of the cables.
  • Page 4   DREDGEPACK® I. Safety Precautions  General Safety Precautions:  • Conduct a thorough risk assessment before starting the installation.  • Ensure that all personnel involved are properly trained in handling equipment and working at heights.  • Use appropriate personal protective equipment (PPE) such as helmets, gloves, safety goggles, and harnesses.  • Communicate clearly with all team members about their roles, the potential hazards, and the safety protocols  to be followed.      Working at Heights:  • Use appropriate fall protection equipment such as safety harnesses, lanyards, and anchor points.      Running Cables:  • Plan cable routes to avoid trip hazards.  • Use  c able  t rays,  c onduits,  o r  c able  t ies  t o  s ecure  a nd  o rganize  c ables. ...
  • Page 5   DREDGEPACK® II. Equipment Overview  Each DREDGEPACK® system for trailing suction hopper dredges (TSHD) is individually designed to fit the  c us‐  tomer’s needs. The following sensors are required for the correct operation of the TSHD System with DREDGE‐  PACK®.  T here  a re  s ome  o ptional  s ensors  p resented  t hat  a re  n eeded  o nly  i n  s pecial  c ases.  W hen  y ou  r eceive  y our  equipment, please verify it is complete. If you have any questions, please let us know. ...
  • Page 6   DREDGEPACK®     A. Dual Antenna GNSS Receiver: This device is used  to  d etermine  t he  p osition  a nd  h eading  o f  t he  d redge.  T he  main antenna is used to calculate positions and elevations  (RTK tides). The receiver uses the secondary antenna to  calculate  t he  d redge  h eading.  T his  s olution  i ncludes  t wo  antennas, ...
  • Page 7   DREDGEPACK®           E. Main Interface Box: The main interface box  receives signals  f rom sensors and directs  t hem  t o  t he  computer running DREDGEPACK®. The enclosure is  IP66 rated.                F. Ultrasonic Sensors: These sensors are used to determine  the amount of material in the hopper. Two are included with  the system.           ...
  • Page 8   DREDGEPACK® III. Installation  Instructions  Dual Antenna GNSS Receiver  DREDGEPACK®  r equires  d redge  p osition  a nd  h eading.  T he  b est  m ethod  t o  o btain  t his  d ata  i s  t o  u se  a   d ual  a n‐  tenna GNSS receiver. ...
  • Page 9   DREDGEPACK® The antennas require a 5/8‐11 UNC bolt or  threaded rod.    WARNING: DO NOT WELD THE  SCREW WITH THE ANTENNAS  SCREWED IN. THIS COULD  CAUSE SERIOUS DAMAGE TO THE  ANTENNA.  Either  a ntenna  c an  b e  a ssigned  a s  t he  m ain  a ntenna.  I t is important to identify the cable of the main antenna because it must be connected to Port 1 of the GNSS receiver. You  w ill  n eed  t o  r un  t he  c ables  i nside  t he  b ridge.  The ...
  • Page 10   DREDGEPACK®   B. Arm  Inclinometers      For each inclinometer, it is necessary to weld a plate for them to    sit flat on. It is recommended to use four M8 stainless‐steel bolts  and lock nuts. Use bolts with springs and washers.  The  i nclinometer  s hould  b e  i nstalled  w ith  t he  ‘ Top’  s ign  p ointing  upwards  w hen  t he  d rag  a rm  i s  i n  t he  r est  p osition.  T he  a rrow  should point perpendicular to the pipe. ...
  • Page 11   DREDGEPACK® Arm Swing Sensor    This sensor is installed on the gimbal. We provide an extra straight arm  to use for attaching the two moving parts. It is very important to align the  rotation sensor with the axis of the drag arm. You can compensate for mis‐  alignment  i n  t he  d river,  b ut  f or  s implicity  t his  i s  n ot  r ecommended.               ...
  • Page 12   DREDGEPACK® Pressure Sensors  Pressure  s ensors  m ust  b e  s ubmerged  t o  f unction  p roperly.  T hey  s hould  b e  i nstalled  a s  c lose  t o  t he  k eel  a s  possible.  The  s ensor  c omes  w ith  a   v ented  j unction  b ox.  T he  s ensors  r ead  t he  p ressure  d ifferential,  s o  t his  b ox  s hould  b e  stored at atmospheric pressure. ...
  • Page 13   DREDGEPACK® Ultrasonic Sensors  To best measure the material in the hopper, there must be one sensor installed forward, and one aft. It is recom‐  mended that they be installed opposite each other and aligned with the dredge’s longitudinal axis. Avoid install‐  ing them both on the same side of that axis, as that will result in incorrect volume calculations.    Mount the sensors at least 20cm (7 in) away from the  inner walls of the hopper. They should be installed  perpendicular  t o  t he  t arget  s urface.  T he  s ensors  h ave  a 12 degree beam.     ...
  • Page 14   DREDGEPACK® Interface Boxes  The interface boxes connect to the switch via ethernet. They can be installed a maximum of 300ft (100m) from  the  s witch,  a s  p erformance  d egrades  w ith  l onger  c ables.  S ince  a   d redge  i s  a   n oisy  e nvironment,  i t  i s  b est  t o  u se  a   shielded ...
  • Page 15             DREDGEPACK®     Why  Choose HYPACK        Simple and intuitive to use      Industry‐leading software  s olutions        Interfaces with a variety of sensors      Unparalleled technical support                               ...