Considerations Before Migration - Red Hat CERTIFICATE SYSTEM 7.0 - MIGRATION GUIDE Manual

Table of Contents

Advertisement

Chapter 1. Introduction to Red Hat Certificate System Migration
Product (including service
packs and hot-fixes)
Red Hat Certificate System
7.1
Red Hat Certificate System
7.2
Red Hat Certificate System
7.3
Table 1.1. Certificate System Subsystem Types and Platforms

2. Considerations before Migration

Since all migrations are unique to a deployment, it is strongly recommended that the entire
migration process be planned in advance. Here are some common issues related to migration.
The Migration Procedure.
• Not all steps in the migration processes apply to every deployment. Follow only the steps
which apply to the deployment being migrated.
• Perform all steps in the migration procedure for every instance of each subsystem being
migrated. Always follow the steps for migration in the order which they are presented in the
manual, even if not every step needs to be performed.
• Perform each subsystem migration as a separate migration. Wait until one subsystem
migration is complete before starting the migration of the next subsystem.
Setting File Permissions.
4
Subsystems
CA
DRM
OCSP
TKS
TPS
CA
DRM
OCSP
TKS
TPS
CA
DRM
OCSP
RA
TKS
TPS
Platforms
Red Hat Enterprise Linux
AS/ES 3
Red Hat Enterprise Linux
AS/ES 4
Solaris 9
Red Hat Enterprise Linux
AS/ES 4 (i386)
Red Hat Enterprise Linux
AS/ES 4 (AMD64, Intel
EM64T)
Solaris 9 (64-bit)
Red Hat Enterprise Linux
AS/ES 4 (i386)
Red Hat Enterprise Linux
AS/ES 4 (for AMD64 and Intel
EM64T)
Solaris 9 (64-bit)

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the CERTIFICATE SYSTEM 7.0 - MIGRATION GUIDE and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Table of Contents