AQMOS R2D2-48 Operating Instructions Manual

AQMOS R2D2-48 Operating Instructions Manual

Volume-controlled time-delayed regeneration 200g salting
Table of Contents

Advertisement

DE
Betriebsanleitung
Programmieranleitung
ENG
Operating instructions
Programming instructions
FR
Mode d'emploi
Guide de programmation
ES
Instrucciones de uso
Instrucciones de programación
IT
Istruzioni per l'uso
Istruzioni di programmazione
POL
Instrukcja obsługi
Instrukcja programowania
Aqmos Wasseraufbereitung GmbH
Im Mittelfeld 4-6
DE – 63500 Seligenstadt
R2D2 – 32 / 48 / 72
1
30
52
73
94
115
RUM
Instrucțiuni
Ghid de programare
SE
Bruksanvisning
Programmeringsguide
SLO
Návod na použitie
Pokyny na programovanie
CZE
Návod k obsluze
Průvodce programováním
NL
Gebruiksaanwijzing
Programmeerhandleiding
Tel.: +49 6182 8966666
136
157
178
197
218
info@aqmos.com
www.aqmos.com

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the R2D2-48 and is the answer not in the manual?

Questions and answers

Summarization of Contents

Installation
Connecting the Mounting Block
Details on connecting the mounting block to the water installation line, ensuring correct flow direction.
Waste Water Connection
Instructions for connecting the waste water drainage pipe to the system and ensuring proper slope and length.
Connecting the Water Softener
Guidance on aligning and positioning the water softener unit on a level and clean surface.
Commissioning
Backwash Procedure
Description of the backwash phase during manual regeneration, including display indicators.
Salting Process
Details on the salting phase, rinse, and fill steps, and adding salt tablets to the brine tank.
Adjusting the Settings on the Control Valve
Control Valve Language and Region
Setting the display language and region units (metric or US) for the control valve.
Regeneration Mode Selection
Choosing the regeneration mode (Time control or Volume immediate/delayed) for the control valve.
Setting Regeneration Time and Days
Configuring the time of day and number of days for automatic regeneration cycles.
Defining Softening Capacity
Inputting the calculated softening capacity based on water hardness and system size.
Setting the Blending
Integrated Blending Valve
Using the control head's integrated valve to adjust water hardness by blending.
Slotted Screw Adjustment
Adjusting water hardness via a slotted screw on the mounting block for more accurate blending.
Drawings
Control Valve Dimensions
Technical drawings showing the physical dimensions of the control valve with measurement indicators.
Exploded View of Control Head
An exploded diagram illustrating the components of the control head (BNT165).

Table of Contents

Save PDF