Sign In
Upload
Download
Table of Contents
Contents
Add to my manuals
Delete from my manuals
Share
URL of this page:
HTML Link:
Bookmark this page
Add
Manual will be automatically added to "My Manuals"
Print this page
×
Bookmark added
×
Added to my manuals
Manuals
Brands
Pramac Manuals
Battery Pack
BSO 50-109
Manual
Pramac BSO 50-109 Manual
Battery storage outdoor
Hide thumbs
1
2
3
Table Of Contents
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
page
of
46
Go
/
46
Contents
Table of Contents
Bookmarks
Table of Contents
Table of Contents
Basic Safety Information
General Safety Instructions for Handling the Battery Storage Outdoor
Symbols
Tools Required
Protective Equipment
Installation Conditions
Checklist before Commissioning
Requirements for the Foundation
Transport Requirements
Overview of Battery Storage Outdoor
Component Overview
Safety Devices
Data Sheet
General Data
Overview: Connecting External Components
Installation of the BSO 50-88/109
Before Installation
Assembling the Battery Storage System
Electrical Connection of the BSO
Connecting the Foundation Earth Electrode
Connection of the AC Supply Line
Connection of the Battery String
Connecting the Network Access Line
Pramac Smart Energy Controller (PSEC) Connection
Energy Meter Connection Via RS485
Energy Meter Connection Via RJ45
Initial Switch-On and Configuration
Before Operation
Switching on the BSO
Configuration of the Battery Inverter
Configuration Via Bluetooth
Configuration Via Ethernet
Configuration of the Energy Meter
Switching on the Battery Rack
Commissioning the Pramac Smart Energy Controller (PSEC)
Calibrating the Active Sensors
Switching off the BSO
Maintenance Information
Maintenance of BSO
Maintenance of PBI 50K-PC and PBI 88K-PC Battery Inverters
Air Conditioner Maintenance
Maintenance of Fire Protection Equipment / Extinguishing Tube
Dismantling and Recycling
Dismantling
Recycling
Recycling Battery Racks
Recycling Battery Inverters
Quality Assurance
Warranty
Technical Support
Advertisement
Quick Links
Download this manual
Manual
Battery Storage Outdoor
BSO 50-88/109
Version 2.0 (No. PS-20036)
February 2024
Table of
Contents
Previous
Page
Next
Page
1
2
3
4
5
Advertisement
Table of Contents
Need help?
Do you have a question about the BSO 50-109 and is the answer not in the manual?
Ask a question
Questions and answers
Related Manuals for Pramac BSO 50-109
Battery Pack Pramac BSO 50-88 Manual
Battery storage outdoor (46 pages)
Summarization of Contents
Foreword
Structure of this Manual
Outlines the organization of the manual content.
Scope of Application
Defines the intended use and applicability of the manual.
Target Group
Identifies the intended audience for this manual.
Symbols Used
Explains the meaning of various symbols used throughout the document.
Basic Safety Information
General Safety Instructions for Handling the Battery Storage Outdoor
Provides essential safety guidelines for operating the Battery Storage Outdoor.
Safety Warnings and Precautions
Highlights critical warnings, cautions, and notes for safe operation and handling.
Symbols
Details important symbols found on the device and their implications.
Tools Required
Lists the necessary tools for setup, assembly, and installation of the BSO.
Protective Equipment
Specifies the recommended personal protective equipment (PPE) for working with the BSO.
Installation Conditions
Details the environmental and site requirements for proper BSO installation.
Recommended Minimum Distances
Specifies required clearance distances for BSO installation and operation.
Checklist BEFORE Commissioning
Provides a pre-commissioning checklist to ensure readiness.
Requirements for the Foundation
Details the specifications for the foundation on which the BSO is installed.
Transport Requirements
Outlines important considerations for the safe transport of the BSO.
Overview of Battery Storage Outdoor
Component Overview
Describes the individual components and internal layout of the Battery Storage Outdoor.
Safety Devices
Details the active and passive safety devices integrated into the Battery Storage Outdoor.
Data Sheet
Presents technical specifications and data for the Battery Storage Outdoor.
Connecting External Components
Illustrates how to connect external components and required customer provisions.
Installation of the BSO 50-88/109
Before Installation
Pre-installation checks and requirements before commencing the installation process.
Assembling the Battery Storage System
Step-by-step instructions for the physical assembly and mounting of the BSO.
Electrical Connection of the BSO
Guide to the electrical connections required for the Battery Storage Outdoor.
Connecting the Foundation Earth Electrode
Instructions for connecting the foundation earth electrode to the BSO.
Connection of the AC Supply Line
Details on how to connect the AC power supply line to the BSO.
Connection of the Battery String
Instructions for connecting the battery string power cables.
Connecting the Network Access Line
Guidance on connecting the BSO to a network or internet connection.
Pramac Smart Energy Controller (PSEC) Connection
Instructions for connecting the Pramac Smart Energy Controller (PSEC).
Energy Meter Connection via RS485
Steps for connecting the energy meter using the RS485 interface.
Energy Meter Connection via RJ45
Steps for connecting the energy meter using the RJ45 (Ethernet) interface.
Initial Switch-On and Configuration
Before Operation
Pre-operation checks required after installation and wiring.
Switching On the BSO
Procedures for safely switching on the Battery Storage Outdoor.
Configuration of the Battery Inverter
Steps for configuring the settings of the battery inverter.
Configuration via Bluetooth
Instructions for configuring the inverter using a Bluetooth mobile app.
Configuration via Ethernet
Instructions for configuring the inverter via an Ethernet connection.
Configuration of the Energy Meter
Guidance on configuring the energy meter settings.
Switching on the Battery Rack
Steps for powering on and initiating the battery rack.
Commissioning the Pramac Smart Energy Controller (PSEC)
Process for commissioning and setting up the PSEC.
Calibrating the Active Sensors
Steps for calibrating the CO and H₂ sensors on the BSO.
Switching Off the BSO
Procedures for safely switching off the Battery Storage Outdoor.
Maintenance Information
Maintenance of BSO
Recommends routine maintenance tasks and intervals for the BSO housing.
Maintenance of PBI 50K-PC and PBI 88K-PC Battery Inverters
Outlines maintenance measures and intervals for the battery inverters.
Air Conditioner Maintenance
Specifies regular maintenance procedures for the air conditioner unit.
Maintenance of fire protection equipment / extinguishing tube
Details regular maintenance for the fire protection device.
Dismantling and Recycling
Dismantling
Step-by-step instructions for safely dismantling the Battery Storage Outdoor.
Recycling
Guidelines for the proper recycling of battery racks and inverters.
Quality Assurance
Technical Support
Table of Contents
Print
Rename the bookmark
Delete bookmark?
Delete from my manuals?
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL
Need help?
Do you have a question about the BSO 50-109 and is the answer not in the manual?
Questions and answers