Honeywell MAXPRO Intrusion MPIP2000E Series Installation And Setup Manual
Honeywell MAXPRO Intrusion MPIP2000E Series Installation And Setup Manual

Honeywell MAXPRO Intrusion MPIP2000E Series Installation And Setup Manual

Integrated security systems
Table of Contents

Advertisement

Quick Links

MAXPRO Intrusion Series
Integrated Security Systems
800-23044-1 Rev. B8
March 2024
Installation and Setup Guide

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the MAXPRO Intrusion MPIP2000E Series and is the answer not in the manual?

Questions and answers

Summarization of Contents

About this Document
Scope
Details the document's scope covering MPI hardware installation, MAXPRO Cloud summary, testing, specifications, and agency information.
Audience
Identifies the primary intended audience for this installation and setup guide.
More Info
Guides users on finding latest document versions and referenced materials on the Honeywell support site.
Introduction
The MAXPRO Intrusion Solution
Overview of the MAXPRO Intrusion Series for integrated intrusion and access control applications.
System Features
Details key system features including touch screen keypads, zone supervision, access control, and expansion capabilities.
General Architecture
Illustrates the system's architecture, showing component interconnections via MAXPRO Cloud.
Installation
Installation and Setup – General Workflows
Outlines the recommended workflow for initial installation, updates, and device swapping.
Mounting the Cabinet
Provides procedures for mounting the MPI cabinet, including tamper switches and component layout.
Installing the Control Panel
Details the steps for mounting the control panel within the cabinet.
Overview of Control Panel Connectors
Identifies and explains the function of all connectors and terminals on the control panel.
Wiring Inputs (Zones)
Explains wiring for different zone types, including EOLR, double balanced, and triple balanced configurations.
Wiring Seismic Sensors
Provides wiring configurations for seismic sensors in single and dual loop setups.
Installing the 4G/LTE Module MPICLTEE
About the 4G/LTE Module
Overview of the optional communication module for cellular backup or primary communication.
Installation
Step-by-step guide for installing the 4G/LTE module, including SIM card and antenna connections.
Disconnecting/Reconnecting
Procedure for safely disconnecting and reconnecting the LTE module from the control panel.
Swapping the SIM Card
Process for changing the SIM card in the LTE module and restarting the panel.
LED Indicators
Explanation of the Power and Network Connected LED indicators on the module.
Installing IB2 Bus Devices
About IB2 Devices
Overview of IB2 bus capabilities, device limits, and automatic module numbering.
Cable Specifications
Recommended cable types and wiring topology for IB2 bus devices.
MPI Keypads MPIKTSMF, MPIKTSPRX
Installation, features, and operation of MPI touchscreen keypads with card readers.
MPI Door Control Module MPIDC1
Description, features, and installation of the single door access control module.
MPI Remote Power Supply MPIPSU35
Information on the supplementary power supply, its features, batteries, and integration.
MPI Transceiver (RF Portal)
Overview, features, and installation of the wireless transceiver for sensors.
Cabinet Mounting with Control Panel or Remote Power Supply
Procedures for installing IB2 modules within cabinets containing panels or power supplies.
Installing V-Plex Devices
About V-Plex Devices
Overview of V-Plex loops, addressable sensors, and current draw limitations.
V-Plex Connections
Details on V-Plex supervision, loop shorts, and cable run limitations.
Powering the System
Wiring the AC Power Supply in the Cabinet
Instructions for wiring the AC power supply to the cabinet and main board.
Powering the Main Board
Connecting the AC power adapter outputs to the main board's input pins.
Installing Backup Batteries
Guidance on determining battery capacity and installing backup batteries.
Connecting to MAXPRO Cloud
Workflow for registering the control panel and peripherals in MAXPRO Cloud.
Shutting Down the Panel Securely
Procedure for safely shutting down the control panel before maintenance.
Configuration in MAXPRO Cloud
MAXPRO Cloud User Interface
Overview of the MAXPRO Cloud interface layout and navigation.
Site Settings
Configuring general settings applicable to all control panels and peripherals at a site.
Control Panel Settings
Settings for the control panel, including overview, installer mode, and various configuration tabs.
Control Panel Input/Output Settings
Configuring zones, outputs, and diagnostics for the control panel.
Scheduling and Holidays
Setting up automated operations like arming/disarming and defining holidays.
People
Defining users, roles, and PIN codes for system access and authorization.
Updating the Firmware
Procedure for downloading and installing firmware updates for the system.
Testing and Commissioning
Battery Test
How the system performs battery tests and reports low battery conditions.
Burglary Walk Test
Procedure for testing zone operation without triggering alarms.
Armed Burglary System Test
Testing system response while armed, including alarm sounds and CMS reports.
Siren Test
Testing all alarm sounders and strobe lights on the system.
Seismic Testing
Procedure for testing seismic sensors connected to vaults.
Important Information
To the Installer
Installer responsibilities for maintenance, testing, and documentation.
Turning the System over to the User
Steps for handing over the system to the customer, including security settings.
Contacting Technical Support
Information required before contacting technical support for assistance.
Events
Event Notification Priority
Prioritization of events sent to the CMS, including special cases like AC power failure.
Indications
General indications displayed on the keypad for various events.
Event Reporting per Area
How events are reported and logged based on system area configuration.
MPI Events and Contact ID Codes
List of MPI events and their corresponding Contact ID codes for reporting.
MPI Events and SIA Codes
List of MPI events and their corresponding SIA codes for reporting.
Specifications
MPI Control Panel
Electrical and physical specifications for the MPI control panels.
MPI Cabinet
Electrical and physical specifications for the MPI cabinet.
MPI Remote Power Supply
Electrical and physical specifications for the MPI Remote Power Supply.
MPI Keypad
Electrical and physical specifications for the MPI keypads.
MPI Door Control Module
Electrical and physical specifications for the MPI Door Control Module.
MPI 4G/LTE Module
Specifications for the 4G/LTE communication module.
Cable Type Requirements
Recommended cable types and lengths for various system connections.
Compliance and Approvals
EU Directives
Lists relevant EU directives applicable to the product.
Product Standards
Information on CE standards, RoHS compliance, and Declaration of Conformity availability.
Product Certification
Details of product certification, including LPCB reference and compliance body.
Instructions for Compliance
Guidelines for configuring the system to meet compliance standards, including settings and user access.
Instructions for Compliance – Sweden
Specific compliance instructions for Sweden, including Abort Window settings.
Disclaimer
Legal disclaimer regarding system security, user authentication, and liability.
NF&A2P Requirements
Requirements for NF&A2P certification, including sealing tape and cyber security.
INCERT Requirements
Requirements for INCERT Grade 3 certification, focusing on current and battery specifications.

Table of Contents