CPS ESSR-10KH1 User Manual

Energy storage battery unit

Advertisement

Quick Links

User Manual for CPS ESSR-05/10/15/20KH1
Energy Storage Battery Unit
Shanghai Chint Power Systems Co., Ltd.
Version 1.2
August 2023

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ESSR-10KH1 and is the answer not in the manual?

Questions and answers

Summarization of Contents

Safety Instructions
Explanation of Safety Symbols
Details safety symbols used in the manual, including DANGER, WARNING, CAUTION, NOTICE, and IMPORTANT.
Interpretation of Product Markings
Explains various product markings like DANGER, WARNING, protective earth, waste sorting, and CE certification.
Safety Precautions
Lists critical safety precautions for installation, operation, and maintenance, including electrical hazards and weather conditions.
Product Introduction
Residential Energy Storage Battery Unit Introduction
Introduces the residential energy storage battery unit, its components, and typical application in a PV system.
Model Marking Explanation
Explains the meaning of the CPS ESSR model designation, breaking down each component of the product code.
Energy Storage Capacity Extension
Details how the energy storage battery unit supports capacity extension by connecting multiple battery stacks and extension modules.
Dimensions and Appearance Overview
Provides detailed dimensions and visual representations of the energy storage battery unit and its main components.
LED Display and Indicator Guide
Explains the function and meaning of the power-on button and LED indicators (system operation, alarm, SOC) on the panel.
Product Protection Functions
Lists the various protection functions integrated into the product, such as short circuit, overcharge, and temperature protection.
Installation
Inspection Before Installation
Details checks required for packaging, safety signs, and included accessories for battery extension modules before installation.
Required Installation Tools
Lists and illustrates the tools and personal protective equipment needed for installation, including drills, wrenches, and safety gear.
Installation Torque Specifications
Specifies the correct torque values for various screws and bolts used during the installation process.
Environmental Requirements for Installation
Outlines environmental conditions like temperature and humidity for safe and optimal product installation.
Installation Methods
Describes permitted installation orientations (vertical only) and restrictions for floor and wall-bracket mounting.
Installation Space Requirements
Specifies the minimum clearance distances required between the unit and surrounding objects for proper installation.
Floor Installation Procedure
Details the step-by-step process for performing a floor installation, including base placement and drilling.
Wall-Bracket Installation Procedure
Provides steps for mounting the unit using a wall bracket, including hole positioning and securing the base.
Electrical Connection
Cable Specifications
Lists the types, outer diameters, and cross-sectional areas of DC, GND, and COM cables used for connection.
Electrical Connection Tools and Torques
Details the tools and specific torque values required for making electrical connections, including crimping and stripping.
External Wiring Ports Identification
Illustrates and identifies the external wiring ports on the energy storage battery unit for various connections.
Wiring Instructions and Safety
Provides essential wiring instructions, safety warnings (DANGER, WARNING), and personal protective equipment requirements.
Grounding Cable Connection Procedure
Details the steps for securely connecting the grounding cable to ensure operator safety and protection.
Communication and Power Line Connection
Explains how to connect communication and power lines, including routing considerations and port usage.
Trial Operation
Installation Checks Before Trial Operation
Lists essential checks related to the support structure and screw tightening performed after installation.
Cable Inspection Before Trial Operation
Details cable connection checks, placement, polarity, circuit breaker status, and grounding reliability.
Startup and Shutdown Procedures
Covers checks, general startup, black start process, and shutdown steps for the energy storage system.
Storage and Recharging
Battery Storage Requirements
Specifies correct placement, handling, and environmental conditions for storing the battery unit to maintain its integrity.
Recharging Cycle and Requirements
Details recharging intervals based on temperature and storage time, along with general recharging guidelines.
Recharging Operation Guide
Explains how to recharge the battery using the inverter, including power ratings and recommended module configurations.
Power-On and Commissioning Steps
Provides a detailed procedure for powering on and commissioning the battery unit, including initial charging and discharging cycles.
Maintenance and Replacement
Maintenance Precautions and Ladder Safety
Outlines safety precautions for maintenance, including ladder usage and ensuring stability during operations.
Routine Maintenance Items and Schedule
Lists routine maintenance tasks for system cleaning, indicators, electrical connections, and grounding, along with their recommended cycles.
Fault List and LED Indicator Troubleshooting
Provides guidance on troubleshooting LED indicators and lists common faults with their causes and recommended solutions.
Quality Assurance
Immunity from Liabilities
Disclaims responsibility for issues arising from improper installation, operation, or environmental factors not conforming to standards.
Quality Terms and Warranty
Refers to the quality warranty manual and provides contact information for questions about the energy storage battery unit.

Table of Contents