Table of Contents

Advertisement

Quick Links

Cisco Nexus 3500 Hardware Installation Guide
First Published: 2018-03-21
Last Modified: 2018-07-18
Americas Headquarters
Cisco Systems, Inc.
170 West Tasman Drive
San Jose, CA 95134-1706
USA
http://www.cisco.com
Tel: 408 526-4000
800 553-NETS (6387)
Fax: 408 527-0883

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the N3K-C3548P-10GX and is the answer not in the manual?

Questions and answers

Summarization of Contents

Chapter 1 Overview of Cisco Nexus 3500 Switches
Overview of Cisco Nexus 3548-10G, 3548-10GX, and 3524 Switches
Provides an overview of the Cisco Nexus 3548-10G, 3548-10GX, and 3524 switches, detailing their features and configurations.
Chapter 2 Preparing the Site for Installation
Temperature Requirement
Specifies the acceptable ambient operating and storage temperature ranges for the Cisco Nexus 3500 series.
Humidity Requirement
Details the acceptable ambient operating and storage humidity levels for the Cisco Nexus 3500 series.
Altitude Requirements
Outlines the altitude limitations for operating the Cisco Nexus 3500 series to ensure proper cooling and electrical function.
Dust and Contaminants
Provides guidelines on maintaining a clean operating environment to prevent dust buildup and internal chassis overheating.
Chapter 3 Installing the Cisco Nexus 3500 Chassis
Safety Precautions for Installation
Highlights essential safety information and warnings before installing, operating, or servicing the switch.
Rack Installation Options
Describes available rack-mount kits, rack types, and cabinet compatibility for installing the Cisco Nexus 3500.
Preparing the Chassis for Installation
Details pre-installation checks including site requirements and equipment verification.
Unpacking and Inspecting the Chassis
Provides steps for safely unpacking and inspecting the chassis for any shipping damage or missing items.
Install 1RU Chassis in Four-Post Rack
Step-by-step guide for installing the 1RU chassis into a standard four-post rack.
Install Switch with NXK-ACC-KIT-1RU Rack-Mount Kit
Instructions for mounting the switch using the NXK-ACC-KIT-1RU rack-mount kit.
Install Switch with N3K-C3064-ACC-KIT Rack-Mount Kit
Instructions for mounting the switch using the N3K-C3064-ACC-KIT rack-mount kit.
Install 1RU Chassis in Two-Post Rack
Step-by-step guide for installing the 1RU chassis into a standard two-post rack.
Grounding the Cisco Nexus Chassis
Details the procedures for properly grounding the switch chassis for safety and electrical integrity.
Starting the Cisco Nexus 3500 Switch
Step-by-step instructions for powering up the Cisco Nexus 3500 switch after installation.
Chapter 4 Connecting the Cisco Nexus 3500 to the Network
Preparing for Network Connections
Guidelines for site preparation and equipment gathering for network connections.
Connecting to a Console Port
Instructions for establishing a console connection for initial switch configuration.
Connecting the Management Interface
Steps for connecting and configuring the switch's management interface.
Installing SFP+ and SFP Transceivers
Guide on how to install SFP+ and SFP transceivers into the switch ports.
Installing QSFP+ Transceivers
Instructions for installing QSFP+ transceiver modules into the switch.
Installing SFP+ and SFP Optical Cables
Procedure for connecting SFP+ and SFP optical cables to transceivers.
Maintaining Transceivers and Optical Cables
Best practices for cleaning and maintaining transceivers and optical cables for optimal performance.
Chapter 5 Replacing Modules in the Cisco Nexus 3500
Replacing a 1RU Fan Module
Procedure for safely replacing a fan module while the system is operating.
Replacing an AC Power Supply
Instructions for hot-swapping an AC power supply unit without interrupting operations.
Replacing a DC Power Supply
Procedure for replacing a DC power supply unit while the system is operating.
Appendix A Rack Specifications for Cisco Nexus 3500
General Requirements for Cabinets and Racks
Specifies general requirements for cabinets and racks, including size and mounting rail standards.
Requirements for Perforated Cabinets
Details specific requirements for perforated cabinets to ensure adequate airflow and cooling.
Requirements for Open Racks
Outlines requirements for mounting the chassis in open racks, focusing on spacing and airflow.
Appendix B System Specifications
Environmental Specifications
Lists ambient operating and non-operating specifications for temperature, humidity, and altitude.
Switch Dimensions
Provides physical dimensions (width, depth, height) for Cisco Nexus 3548 and 3524 chassis.
AC Power Cable Specifications
Details specifications for various AC power cables, including part numbers, voltage, and length.
DC Power Cable Specifications
Specifies requirements and details for DC power cords and terminal blocks.
HVDC Power Cable Specifications
Details specifications for HVDC power cables, including part numbers and connector types.
Appendix C LEDs on Cisco Nexus 3500
Chassis LEDs Description
Provides descriptions for various LEDs on the Cisco Nexus 3500 chassis, including status and identification.
Fan LEDs Status and Description
Explains the status and meaning of fan LEDs, indicating operational status and potential issues.
Power Supply LEDs Status and Description
Details the status and meaning of power supply LEDs, indicating power status and fault conditions.
Appendix D Spare Parts Support Table
Spares Support Table
Lists available spare parts for the Cisco Nexus 3500 series, including power supply, fan, and accessory kit options.

Table of Contents