Table of Contents

Advertisement

Quick Links

Installation and operation manual
VRV 5-S system air conditioner
RXYSA4A7V1B
RXYSA5A7V1B
RXYSA6A7V1B
RXYSA4A7Y1B
Installation and operation manual
RXYSA5A7Y1B
English
VRV 5-S system air conditioner
RXYSA6A7Y1B

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the VRV 5-S RXYSA5A7V1B and is the answer not in the manual?

Questions and answers

Summarization of Contents

User Safety Instructions
General Safety Precautions
General safety precautions for users.
Safe Operation Instructions
Guidelines for operating the unit safely.
About the System
System Overview and R32 Refrigerant
Explains the VRV 5-S system and R32 refrigerant.
Operation
Operation Range and Modes
Defines operating temperature/humidity and modes.
Using the Dry Program
Instructions for humidity reduction mode.
Adjusting Air Flow Direction
How to control the air direction.
Setting the Master User Interface
Procedure to designate the master control unit.
Maintenance and Service
Refrigerant Information
Details on refrigerant type and handling.
After-Sales Service and Warranty
Information on warranty and recommended service.
Troubleshooting
Error Codes Overview
List and explanation of malfunction codes.
Non-Malfunction Symptoms
Common symptoms not indicating system failure.
Relocation and Disposal
Relocation Procedures
Guidelines for moving the unit.
Unit Disposal Procedures
Proper procedures for discarding the unit.
About the Box
Outdoor Unit Handling and Unpacking
Instructions for unpacking and handling the outdoor unit.
Special Requirements for R32 Units
Installation Space Requirements
Space requirements for R32 units.
System Layout Requirements
Requirements for R32 system layout.
Determining Refrigerant Charge Limit
Procedures for calculating the refrigerant charge limit.
Unit Installation
Preparing the Installation Site
Guidelines for preparing the installation site.
Opening and Closing the Unit
Steps to open and close the outdoor unit cover.
Mounting the Outdoor Unit
Procedures for mounting the outdoor unit.
Piping Installation
Refrigerant Piping Preparation
Requirements and material for piping.
Connecting Refrigerant Piping
Steps for connecting refrigerant pipes.
Checking Refrigerant Piping
Procedures for leak testing and checking pipes.
Charging Refrigerant
Charging Precautions
Safety and operational precautions for charging.
Determining Additional Refrigerant Amount
How to calculate the amount of additional refrigerant.
Charging Procedure
Steps to charge the refrigerant.
Electrical Installation
Electrical Compliance
Standards and compliance for electrical installation.
Standard Wiring Components
Specifications for wiring components and connections.
Connecting External Outputs
How to connect external output signals.
Cool/Heat Selector Switch Option
Installation of the optional cool/heat selector switch.
Finishing Outdoor Unit Installation
Compressor Insulation Resistance Check
Procedure to check compressor insulation resistance.
Insulating Refrigerant Piping
Steps to insulate refrigerant piping.
Configuration
Making Field Settings
How to access and change field settings.
Mode 1 and Mode 2 Operations
Using modes for monitoring and settings.
Commissioning
Commissioning Precautions
Important precautions before commissioning.
Commissioning Checklists
Checklists for installation and commissioning.
Performing the Test Run
Procedure for conducting the system test run.
Troubleshooting
Solving Problems via Error Codes
How to resolve issues based on error codes.
Refrigerant Leak Detection System
Information on the refrigerant leak detection system.
Disposal
Proper Disposal Procedures
Guidelines for safe and legal disposal of the unit.
Technical Data
Outdoor Unit Service Space
Required service space dimensions for outdoor units.
Piping Diagram
Diagram showing the refrigerant piping layout.
Wiring Diagram
Diagram illustrating the electrical wiring connections.

Table of Contents