Page 2
Control panels and control-leads ..........11 Kontrollpanel og kontrollkabler ..........11 Important user precautions ............11 Viktige brukerforhold ..............11 How to use Side-Power thrusters ..........12 Hvordan bruke Side-Power thrustere ........12 Troubleshooting ............... 13 Problemer og løsninger ............13 Warranty statement ..............14 Warranty statement ..............
Page 3
SEP/60/185 S 12V SEP/60/185 S 24V SEP/SRP/SRVP/SRLP/SXP 80/185 T 24V SEP/SRP/SRVP/SRLP/SXP 100/185 T 24V SEP/120/215 T 24V SEP/SRVP 130/250 T 24V PPC 820 SEP/SRP/SRVP/SRLP/SXP 80/185 T 12V SEP/SRP/SRVP/SRLP/SXP 100/185 T 12V SEP/SRVP 130/250 T 12V SEP/150/215 T 24V SEP/SRVP 170/250 TC 24V...
Page 4
Dimensions PPC 520 (Drawing not to scale) ( 1 : 1 ) 180,0 Dimensions PPC 820 (Drawing not to scale) Designed by Material Type Date Drawing nr Tolerance NS-ISO 2768-1 03-01-060-120 Thomas Quiel 27.01.2015 180,0 Copyright All rights reserved Title...
Page 5
If you are installing the Side-Power in a small room /compartment, it should be ventilated to ensure cooling of the electromotor. If the height in the room you are installing the Side-Power is limited, the Side-Power can be installed horizontally or at any angle in between.
Page 6
Side-Power products connected void and null. If you are interfacing by agreement with Sleipner and through a designated Side-Power supplied interface, you are still required to also install at least one original Side-Power control panel to enable efficient troubleshooting if necessary.
Page 9
• Ved bruk av Side-Power originalutstyr er alle elektriske kontakter klare • When using original Side-Power equipment it is all “plug & go”.
Page 10
1. Skru på hovedstrømmen (skru alltid av hovedstrømmen når du ikke er the main power switch when not on board.) A Side-Power Automatic om bord i båten). En Side-Power Automatic Main Switch slås på / av Main Switch will turn on/off when the panel is turned on/off.
Page 11
Trouble shooting Before seeking assistance at the help desk of your Side-Power dealer/distributor please perform these tests and make notes of all measurements to ensure that they have as much information as possible to work on. NB! All check points and solutions must be carried out after consulting the relevant information elsewhere in this manual to under- stand how the system is intended to work.
Page 12
Warranty statement 1. The equipment manufactured by Sleipner Motor AS (The “Warrantor”) is warranted to be free from defects in workmanship and materials under normal use and service. 2. This Warranty is in effect for of two years (Leisure Use) or one year (Commercial use) from the date of purchase by the user. Proof of purchase must be included, to establish that it is inside the warranty period.
Page 16
Worldwide sales and service www.side-power.com SLEIPNER MOTOR AS P.O. Box 519 N-1612 Fredrikstad Norway The information given in the document was correct at the time it was published. However, Sleipner Motor AS can not accept liability for any inaccuracies or omissions it may contain.
Need help?
Do you have a question about the PPC 520 and is the answer not in the manual?
Questions and answers