Pre-Installation Preparation - Desa VM42P Owner's Operation And Installation Manual

B-vent decorative gas fireplace
Table of Contents

Advertisement

PRE-INSTALLATION
PREPARATION
CLEARANCES
Minimum clearances to combustibles are:
• Back and Sides of Outer Surround . . . 0" min.
• Drywall to Sides of Front Face
(Nailing Flanges) . . . . . . . . . . . . . . 0" min.
• "B" Vent Surfaces . . . . . . . . . . . . . . . . 1" min.
• Ceiling to Opening . . . . . . . . . . . . . . 42" min.
• Floor . . . . . . . . . . . . . . . . . . . . . . . . . . 0" min.
• Perpendicular Wall . . . . . . . . . . .See Figure 6
CAUTION: Do not block
required air spaces with insu-
lation or any other material. Do
not obstruct effective opening
of appliance with any type of
facing material.
Left Side
Surround
0" Clearance
Front Face
Figure 3 - Minimum Clearances
(Top View)
108795-01N
2 x 4 Stud
Nailing
Flange
Back
Drywall
www.desatech.com
0"
7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents

Save PDF