Download Print this page

Advertisement

Quick Links

1

Advertisement

loading
Need help?

Need help?

Do you have a question about the Z1T-R4 and is the answer not in the manual?

Questions and answers

Summarization of Contents

Machine Structure and Preparation
Preparation for Operation and Transport
Instructions on preparing the machine for safe transport and initial operational setup.
Operation Guide for Pipe Threaders
Adjusting the Pipe
Steps to correctly secure the pipe within the machine's chucks for processing.
Preparing for Threading
Pre-threading checks and settings like die selection and diameter adjustment.
Threading Process
Step-by-step guide on how to perform the pipe threading process using the machine.
Setting Thread Diameter
Instructions on how to adjust the machine's scale for the desired thread diameter.
Removing and Installing Dies
Procedures for safely removing existing dies and installing new or replacement dies.
Pipe Cutting and Reaming
Guidance on using the machine's cutting and reaming functions for pipes.
Thread Head Lubrication and Maintenance
Information on maintaining the thread head lubrication system and general checks.
Front Chuck Jaw Removal
Steps for disassembling and removing the jaws from the front chuck for maintenance.