Sign In
Upload
Download
Table of Contents
Contents
Add to my manuals
Delete from my manuals
Share
URL of this page:
HTML Link:
Bookmark this page
Add
Manual will be automatically added to "My Manuals"
Print this page
×
Bookmark added
×
Added to my manuals
Manuals
Brands
Raytech Manuals
Touch terminals
CAPO 12
Instruction manual
Raytech CAPO 12 Instruction Manual
Hide thumbs
1
Table Of Contents
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
page
of
117
Go
/
117
Contents
Table of Contents
Troubleshooting
Bookmarks
Table of Contents
Table of Contents
Safety Precautions
Safe Operation
Ground the Instrument
Operator Qualifications and Safety Standards
Measuring Cable Management and Connection
Before Applying Power
Keep Away from Live Circuits
Do Not Operate in an Explosive Atmosphere
Do Not Substitute Parts or Modify Instrument
Transportation and Lifting
Capo
Unpacking
Technical Specifications CAPO 2.5
Measurement Parameters CAPO 2.5
Capo
Unpacking
Technical Specifications CAPO 12
Measurement Parameters CAPO 12
Introduction
General
Advantages & Features
System Details
Quick Start Guide
Connection
Instrument Operation
Power Factor / tan Δ Measurements
Definitions
Dissipation Factor tan Δ
Power Factor (PF) Cos Φ
Background
Imperfect Dielectric
Equivalent Circuits
Conversion Series- Parallel-Replacement Circuit Diagram
Simplifications for Small Dissipation / Power Factor
Conversion Capacitances to Inductances
Operation Elements
Capo 2.5
Capo 12
Operating Menu
Menu Structure
Main Menu
Main Menu Screen
Safety-Switch
Earth Connection
Test Object
Time
Battery Symbol
Measurement Mode
Caption
Measurement Frequency
Measurement Voltage
Start a Measurement
Single Measurement
Multi Measurement
Continuous Measurement
Setup
General
License
About
Clock
Cursor
Update
Language
Service
Operator
Oil Correction Table
Dissipation Factor
Quality Assistant
Printer
Colour
Results and Data Structure
New
New Test Object
Load from Archive
New Measurement
Info
Archive
Info
Diagram
Measurement Modes
Overview
UST Ungrounded Specimen Test
Ust a
Ust B
Ust a + B
Gst
Gst a + B
Gstg
Gstg a
Gstg B
Gstg a + B
Xfrmr
Hl Hv
Hl Lv
Hlt Hv
Hlt Lv
Hlt Tv
Multi
Excitation Current Iexci
Bushing Test
Bushing Overall Test
Bushing Main Insulation Test
Bushing Tap Insulation Test
Bushing Hot Collar Test
Interfaces
Hardware
Usb
Safety
Temp
Appendix
A Raytech T-Base
T-Base Lite
T-Base Pro
B System Update
C Software Development Kit (SDK)
D Command Syntax
Raytech Usb/Serial Port Driver
Command Syntax
Answer-Codes
Synchronous Answers
Asynchronous Answer
Serial Interface
USB Interface
E USB Printer Info
Printer Requirements
Suggested Printers
F Service Mode
Calibrate Touchscreen
Show Ground Warning
CSV Separator
Raytech USB Driver
Show Series Values
Oil Correction Table
G Error Messages
H Trouble Shooting
Touch Panel Does Not Work
USB Memory Stick Does Not Work
I Warranty Conditions
Limitation of Warranty
Arbitration
J Contacts
K Index
Advertisement
Quick Links
Download this manual
INSTRUCTION MANUAL
ENGLISH
CAPO 2.5 / CAPO 12
CAPACITANCE AND POWER FACTOR
METER
RAYTECH AG , OBEREBENESTRASSE 11, CH-5620 BREMGARTEN, SWITZERLAND
Table of
Contents
Previous
Page
Next
Page
1
2
3
4
5
Advertisement
Table of Contents
Need help?
Do you have a question about the CAPO 12 and is the answer not in the manual?
Ask a question
Questions and answers
Related Manuals for Raytech CAPO 12
Touch terminals Raytech CAPO 2.5 Instruction Manual
(117 pages)
Summarization of Contents
Safety Precautions
Safe Operation
Guidelines for qualified personnel to operate test equipment safely.
Ground the Instrument
Importance of proper grounding to prevent shock hazard and instrument damage.
Operator Qualifications and Safety Standards
Emphasizes reading manual, user responsibility, and qualified personnel for maintenance.
Measuring Cable Management and Connection
Proper handling of shielded cables to prevent discharge or flashover.
Before Applying Power
Instruction to read manual and understand operation before powering on.
Keep Away from Live Circuits
Avoid servicing with power connected; discharge circuits before touching components.
Do Not Operate in Explosive Atmosphere
Avoid operating in presence of flammable gases or fumes.
Do Not Substitute Parts or Modify Instrument
Avoid unauthorized modifications; return to service for repairs.
Transportation and Lifting
Caution regarding lifting heavy instruments like CAPO 12.
CAPO 2.5
Unpacking CAPO 2.5
Lists all items included in the CAPO 2.5 package.
Technical Specifications CAPO 2.5
Details the technical specifications of the CAPO 2.5 model.
Measurement Parameters CAPO 2.5
Lists measurable parameters, their ranges, resolutions, and accuracies.
CAPO 12
Unpacking CAPO 12
Lists all items included in the CAPO 12 package.
Technical Specifications CAPO 12
Details the technical specifications of the CAPO 12 model.
Measurement Parameters CAPO 12
Lists measurable parameters, ranges, resolutions, and accuracies for CAPO 12.
Introduction
General Overview
Overview of CAPO 2.5/12 instruments, their features, and applications.
Advantages and Features
Lists key advantages and features of the CAPO instruments.
System Details
Information on system checks and power source requirements.
Quick Start Guide
Connection Procedure
Steps for correctly connecting the instrument and safety ground.
Instrument Operation Basics
Basic steps for powering on and starting a measurement.
Power Factor and Tan Delta Measurements
Definitions
Defines power factor (cos φ) and dissipation factor (tan δ) in electrical circuits.
Dissipation Factor (tan δ)
Explains the formula and meaning of dissipation factor (tan δ).
Power Factor (PF) cos φ
Explains the formula and meaning of power factor (cos φ).
Background
Discusses the importance of PF/tan δ testing for insulation and dielectric properties.
Imperfect Dielectric Concept
Explains the concept of imperfect dielectrics and their relevance.
Equivalent Circuits
Illustrates series and parallel circuit models for imperfect dielectrics.
Series-Parallel Conversion
Provides formulas for converting between series and parallel circuit models.
Simplifications for Small Dissipation/Power Factor
Presents simplified formulas for small dissipation/power factor values.
Capacitance to Inductance Conversion
Explains how to convert capacitance measurements to inductance.
Operation Elements
CAPO 2.5 Operation Elements
Identifies and describes the operation elements specific to the CAPO 2.5 model.
CAPO 12 Operation Elements
Identifies and describes the operation elements specific to the CAPO 12 model.
Operating Menu
Menu Structure Overview
Overview of the CAPO 12 menu structure and navigation.
Main Menu Screen
Explains the components and interactions on the main menu screen.
Measurement Mode Selection
How to select and change the measurement mode.
Measurement Frequency Selection
How to select and set the measurement frequency.
Measurement Voltage Selection
How to select and set the measurement voltage.
Starting a Measurement
Steps to initiate a measurement, including single, continuous, and multi modes.
Setup Menu Navigation
Accessing and navigating the instrument's setup menu.
Results and Data Management
How measurement results are stored and managed.
Measurement Modes
Mode Overview
Introduces the three measurement inputs and how they combine into modes.
UST Ungrounded Specimen Test
Explains the UST configuration for ungrounded tests.
GST Grounded Specimen Test
Explains the GST configuration for grounded insulation testing.
GSTg Guarded Test
Explains the GSTg configuration for guarded measurements.
Xfrmr Transformer Testing
Mode for measuring transformer capacitances.
Excitation Current Measurement
Mode for performing excitation current tests.
Bushing Test
Bushing Overall Test
Setup for testing overall bushing insulation (C1+C2).
Bushing Main Insulation Test
Setup for testing main bushing insulation (C1).
Bushing Tap Insulation Test
Setup for testing bushing tap insulation (C2).
Bushing Hot Collar Test
Setup for testing insulation losses in a small bushing section.
Interfaces
Hardware Interfaces
Details the physical hardware interfaces of the instrument.
RS 232 Serial Interface
Specifies the RS232 serial interface parameters.
USB Interfaces
Describes the USB master and slave interfaces.
Safety Connector
Explains the safety connector and its pins for external devices.
Temperature Probe Connection
Details the connection and specifications for an external temperature probe.
Appendix: Command Syntax
Appendix: Service Mode
Appendix: Error Messages
Appendix: Trouble Shooting
Table of Contents
Print
Rename the bookmark
Delete bookmark?
Delete from my manuals?
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL
Need help?
Do you have a question about the CAPO 12 and is the answer not in the manual?
Questions and answers