This manual describes proper installation procedures and provides necessary standards required for product reliability. Warranty details are available at IronRidge.com. All installers must thoroughly read this manual and have a clear understanding of the installation procedures prior to installation. Failure to follow these guidelines may result in property damage, bodily injury or even death .
• Any System Tilt with Modules Types 1, 2, 3, 13, 19, 25 & 29 on Low Slope Roofs (< 9.5 degrees) • Any module-to-roof gap is permitted with no perimeter guarding required. This rating is applicable with any IronRidge or 3rd party roof attachment and with or without concrete blocks in the Chassis.
THE INFORMATION CONTAINED IN THIS DRAWING (BX MIPO MOUNTING ASSEMBLY 20 PCK INST.) .XX: +/- .030 .X: +/- .75 IS THE SOLE PROPERTY OF IRONRIDGE INC. ANY REPRODUCTION IN PART OR .XX: +/- .25 .XXX: +/- .010 Cable Tie Edge Clip Cable Tie AS A WHOLE WITHOUT THE WRITTEN ANGLES: +/- 1°...
GROUNDING LUG • Burndy CL501TN, BGBS4 FLANGE NUT MLPE DEVICES (OPTIONAL) The following MLPE module mounting brackets have been tested or evaluated for use with the BX system: • EcoFasten Frame MLPE Mount • QMPV Accessory Frame Bracket ➢ Refer to respective installation instructions of MLPE module mounting brackets.
Page 12
3. SECURE LUGS MODULE COMPATIBILITY The BX System may be used to ground and/or mount a PV module complying with UL 2703 only when the specific module has been evaluated for grounding and/or mounting in compliance with the included instructions. Unless otherwise noted, “xxx”...
Need help?
Do you have a question about the BX-10D-P1 and is the answer not in the manual?
Questions and answers