Tarana G1 Installation Manual

Remote node
Hide thumbs Also See for G1:

Advertisement

Quick Links

Remote Node Installation Guide
(CBRS)
vIG_RN_CBRS_2021-08
PN: 18-0010-001 Rev. 1.0
RN Installation Guide vIG_RN_CBRS_2021-08 — 0
Tarana Wireless, Inc. ©2021. All rights reserved.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the G1 and is the answer not in the manual?

Questions and answers

Summarization of Contents

Safety and Warnings
General Warnings
General precautions to prevent personal injury or equipment damage during installation and use.
FCC Information
Details the FCC occupational controlled limit for maximum permissible exposure (MPE) for the device.
General Health and Safety Information
Explains flammability, hazardous materials, voltage, signs, and surface temperatures relevant to the equipment.
Warning Labels
Information regarding tamper seals and warnings about unauthorized modifications to the equipment.
General Hazards
Protection from RF Exposure
Guidelines for safe installation and servicing of antennas regarding RF exposure.
Grounding Connections
Importance of maintaining reliable grounding of the RN chassis for protection.
Power Supply
Requirement to use Tarana-provided Power over Ethernet (PoE) injectors for the device.
Maximum Ambient Temperature
Specifies the maximum ambient temperature for the RN product to ensure reliability and operation.
Rack Mount Temperature Considerations
Guidance on mounting the RN to allow for proper airflow and avoid RF signal obstruction.
Regulatory Information
Compliance
Lists safety standards and radio approvals applicable to the Tarana G1 equipment.
Deployment in the US – FCC Statement
States FCC compliance rules, conditions, and RF exposure limits for the device.
USA CBRS Band Category B Device
Details requirements for Category B CBSD devices in the USA CBRS band.
Preparation
Tools
Lists the necessary tools required for the Tarana RN installation process.
Customer Supplied Equipment
Lists essential customer-provided items for installation, including cables and grounding wire.
Tarana Hardware and Peripherals
Lists the hardware and peripherals supplied by Tarana for installation.
Physical Installation
RN Chassis Bracket Assembly
Details the process of attaching the chassis bracket to the RN unit.
Elevation Bracket Installation
Instructions for installing the elevation bracket on a pole or wall.
Antenna Aiming
Guidance on aiming the RN antenna towards the Base Node (BN).
Grounding and Powering the RN
Steps for correctly grounding and powering the RN unit according to regulations.
Power Up the RN
Describes the RN power-up process and the meaning of its LED indicators.

Table of Contents