Seraphim SRP BMD Series Installation Manual

Seraphim SRP BMD Series Installation Manual

Photovoltaic module 2021 v3.3

Advertisement

Quick Links

公司名:赛拉弗光伏系统有限公司
Name: SERAPHIM SOLAR SYSTEM CO., LTD.
地址:中国常州市武进区横林镇横遥路1-2号
Add: No.1-2, Hengyao Road, Henglin Town, Wujin District,
Changzhou City, P.R. China
Installation Guide for
SERAPHIM photovoltaic module
2021 V3.3

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SRP BMD Series and is the answer not in the manual?

Questions and answers

Summarization of Contents

Introduction for User Manual
Disclaimer
Company reserves rights to change manual without prior notice. English version prevails.
Limitation of Liability
Company not responsible for damage or injury from failure to follow instructions.
Safety Precautions
Warning
Read all instructions before installation. Direct contact with live parts may cause death.
General Safety
Comply with local codes and international standards. Professional installation recommended.
Handling Safety
Do not stand, walk on, or lean on modules. Avoid scratching surfaces. Handle with care.
Unload, Transport, and Storage
Makers on Outer Packaging
Verify product details upon receipt. Handle packages with care, avoid damage.
Unloading Warning
Use suitable lifting fixtures. Ensure pallets and ropes are secure. Place modules on level ground.
Secondary Transport and Warning
Secure packages during transport. Avoid improper vehicles. Do not transport by one person.
Storage
Store in dry, ventilated, waterproof place. Do not expose to rain or moisture. Stack max 2 layers.
Working Conditions
Details on operating temperature, humidity, and electrical characteristics.
Electrical Rating
Provides electrical characteristics for various module series.
Installation
Installation Safety
Wear protective equipment. Do not install in rain/snow/wind. Ensure connections are secure.
Environment Conditions and Site Selection
Install in recommended conditions. Avoid shading and water exposure.
Tilt Angle of Installation
Optimize tilt angle for energy output. Minimum 10° tilt for dust removal.
Installation Requirements for Bifacial Cells Module
Consider ground reflectivity and height for bifacial module performance.
Installation Method
Install using clamp or screw method. Ensure modules withstand design loads. Use proper hardware.
Module Maintenance
Panel Visual Inspection and Replacement
Regularly check modules for damage. Replace damaged modules with same type. Use safety equipment.
Connector and Cable Inspection
Perform checks every 6 months. Inspect seals, wiring, connections, and torque.
Cleaning
Clean modules to maintain output. Use soft cloths and mild detergent. Follow water quality requirements.

Table of Contents