Download Print this page

LS ELECTRIC Metasol Series Instruction Manual

Air circuit breaker

Advertisement

Quick Links

사용자 매뉴얼 /
Instruction Manual /
기중차단기
Air Circuit Breaker / 万能断路器 /
Воздушные автоматические выключатели
使用说明书 / Руководство по эксплуатации
제품에 대한 상세 기술자료는 자사 홈페이지에서
다운로드 받으실 수 있습니다.
Detailed technical data for the product can
be downloaded from our website.
产品的详细技术资料可从本公司主页下载.
Подробные технические данные о продук
те можно скачать с нашего веб-сайта.

Advertisement

loading
Need help?

Need help?

Do you have a question about the Metasol Series and is the answer not in the manual?

Questions and answers

Summarization of Contents

Safety Precautions
General Safety Warnings
Warnings regarding qualified personnel and adherence to instructions for safe operation.
Risk of Personal Injury or Damage
Details risks and precautions for personal safety and equipment protection during operation.
Storage Guidelines
Temperature Ranges for Operation & Storage
Specifies the recommended temperature ranges for product operation and storage.
Stacking Limits and Configurations
Defines maximum stacking layers based on product rating and type.
Unpacking Procedures
Individually Packed ACB Handling
Illustrates unpacking for draw-out and fixed types in individual packaging.
Unpacking ACB in Connected Status
Details the steps for unpacking an ACB when it is in a connected state.
Transport and Weight Information
AH Type (Susol ACB) Transport Weights
Lists transport weights for AH type ACBs by rating and pole configuration.
AS Type (Metasol ACB) Transport Weights
Lists transport weights for AS type ACBs by rating and pole configuration.
AN Type (Metasol ACB) Transport Weights
Lists transport weights for AN type ACBs by rating and pole configuration.
Insulation Barrier Installation
Fixed Type Insulation Barrier Installation
Shows the procedure for installing insulation barriers on fixed type ACBs.
Draw-out Type Insulation Barrier Installation
Shows the procedure for installing insulation barriers on draw-out type ACBs.
Installation Methods
Fixed Type Installation and Torque Specs
Illustrates fixed type installation and specifies mounting bolt torque.
Draw-out Type Installation Procedure
Details the steps for installing the draw-out type ACB.
Bus-Bar and Cable Connection
Cable Connection Guidelines
Guidelines for connecting cables to rear terminals without applying excessive mechanical force.
Bus-Bar Connection & Safety Distance
Instructions for bus-bar connection, torque, support, and minimum safety distance.
DC ACB Testing and Wiring
DC ACB Insulation Test Procedure
Procedure for setting the isolation mechanism for insulation testing.
DC Product Wiring Diagrams
Wiring configurations for DC ACB types ADH and DDH.
Operation Methods
Manual Operation Steps
Steps for manual operation of the circuit breaker, including charging and ON/OFF.
Key Lock Operation Procedure
Instructions for operating the key lock mechanism on the device.
Draw In & Out Operation Steps
Steps for drawing in and out the circuit breaker from its cradle.
User Jack Installation and Removal
Wire Terminal Insertion Procedure
Procedure for inserting wire terminals into the user jack.
Wire Terminal Removal Procedure
Procedure for removing wire terminals from the user jack.
Control Circuit Wiring Diagrams
Wiring Diagram (STU Applied)
Wiring diagram for systems where STU is applied.
Wiring Diagram (Old OCR Applied)
Wiring diagram for systems using older OCR configurations.
General Use Wiring Diagram
Standard wiring diagram for general use applications.
Trip Coil Supervision Wiring Diagram
Wiring diagram for the optional trip coil supervision feature.
DC ACB Circuit Diagram
Circuit diagram specifically detailing the connections for DC ACB units.
Safety Instructions and Company Info
General Safety Precautions
Important safety advice for users before operating the product.
Company Vision and Contact Information
Information about the company's vision and contact details.