Download Print this page

Advertisement

Quick Links

Sliding Gate Operator
User's Manual
GT-600,GT-1000,GT-1500
AND
GT2000 (SINGLE PHASE)

Advertisement

loading
Need help?

Need help?

Do you have a question about the GT-1000 and is the answer not in the manual?

Questions and answers

Summarization of Contents

Mechanical Installation
Gate Preparation
Ensure gate is properly installed and slides smoothly before installing the operator. It must be plumb, level, and move freely.
Installation of Rack
Details on fixing nuts, laying rack on gear, welding, and ensuring proper meshing with the gear.
Magnetic Limit Switch
Instructions for installing magnetic limit switches at both ends of the gate for safety and position control.
Wire Connecting
Three-button/Single-button Switch (Keypad)
Guide to connecting keypad or external switches for gate control (open, close, stop).
Pedestrian Switch
Instructions for wiring a pedestrian switch to open the gate partially.
Tuning and Operation
Adjusting Resistance (VR1-VR4)
Details on adjusting motor working time, brake force, stop width, and output force using VR potentiometers.
Remote Control
Adding Remote Controls (Learn)
Procedure to program new remote controls by pressing the 'S1' learn button.
Erasing Remote Controls
Method to clear all previously programmed remote controls.
Programming Process
Adjusting DIP Switches
Configuration settings via DIP switches for soft start, limit switch type, and auto-close time.