Advertisement

Quick Links

Operating Manual
Multicluster Box 6.3 ⁄ 12.3
MC-BOX-6_12-BE-en-20 | Version 2.0
ENGLISH

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the MC-Box-12.3 and is the answer not in the manual?

Questions and answers

Summarization of Contents

Legal Provisions
SMA Warranty
Details current warranty conditions for the device, available online and from sales channels.
Trademarks
Acknowledges recognized trademarks and licensing for Bluetooth® and QR Code®.
Information on this Document
Validity
Specifies the device types for which this document is valid.
Target Group
Identifies the intended audience as qualified persons with appropriate skills.
Symbols
Explains the meaning of various symbols used in the document for warnings and information.
Nomenclature
Lists the complete designation and the designation used for the Multicluster Box and system.
Abbreviations
Defines abbreviations like AC, DC, and PV used throughout the manual.
Safety
Intended Use
Describes the purpose of the Multicluster Box: connecting Sunny Island inverters, loads, and generators.
Skills of Qualified Persons
Outlines the necessary skills and training for personnel working with the device.
Safety Precautions
Details critical safety measures, including warnings about electric shock and proper handling.
Scope of Delivery
Multicluster Box 6.3
Lists the components included in the delivery for the Multicluster Box 6.3.
Multicluster Box 12.3
Lists the components included in the delivery for the Multicluster Box 12.3.
Type Label
Symbols on the Type Label
Explains the meaning of symbols found on the product's type label, such as voltage and temperature warnings.
Mounting and Installation
Selecting the Mounting Location
Provides requirements and recommendations for choosing a suitable installation site for the Multicluster Box 6.3.
Mounting the Multicluster Box 6.3 on the Wall
Details the procedure and required materials for securely mounting the Multicluster Box 6.3 onto a wall.
Selecting a Mounting Location
Outlines conditions and support surface properties for choosing a mounting location for the Multicluster Box 12.3.
Transporting the Multicluster Box 12.3
Describes safe transport options and precautions for the Multicluster Box 12.3, emphasizing weight and center of gravity.
Installing the Multicluster Box 12.3
Explains how to mark drill holes and install the Multicluster Box 12.3 on its base or wall.
Electrical Connection
Overview of the Connection Area
Provides an overview of the connection area, illustrating internal views and bottom views for both box types.
Preparing the Cables
Provides instructions and notices for preparing connection cables, including piercing membranes and fitting terminals.
Cable Connection
Details the process of connecting generators, loads, PV systems, Sunny Island inverters, and grounding.
Data Cable Connection
Details the process of connecting data cables for communication and measuring signals.
Commissioning the Multicluster Box
Requirements
Lists essential requirements before commissioning, including mounting, grounding, and cable connections.
Procedure
Details the commissioning process, including system configuration and battery management considerations.
Disconnecting the Multicluster System from Voltage Sources
Procedure
Provides a step-by-step guide for safely disconnecting the multicluster system from all voltage sources.
Maintenance
Maintenance work
Details the required maintenance tasks, recommended intervals, and safety precautions for servicing the unit.
Decommissioning
Disassembling the Multicluster Box 6.3
Provides instructions for safely disassembling the Multicluster Box 6.3, including cable removal and screw loosening.
Disassembling the Multicluster Box 12.3
Details the procedure for disassembling the Multicluster Box 12.3, including kick plate removal and enclosure closing.
Storing the Product
Specifies the storage conditions for the Multicluster Box, including temperature and dryness requirements.
Disposal
Instructs on the proper disposal of the Multicluster Box at the end of its service life, following electronic waste regulations.
Technical Data of the Multicluster Box 6.3
Load Connection
Lists technical specifications for the load connection, including rated power, voltage, and conductor cross-section.
Sunny Island Connection
Provides technical data for connecting Sunny Island inverters, such as quantity, rated power, and fuses.
Generator Connection
Details technical specifications for generator connection, including input power, voltage, and current.
PV System Connection
Lists technical data for the PV system connection, including rated power, voltage, and short-circuit current.
Technical Data of the Multicluster Box 12.3
General Data
Provides general specifications for the Multicluster Box 12.3, including voltage, frequency, and mounting type.
Sunny Island Connection
Lists technical data for connecting Sunny Island inverters, including quantity, rated power, and fuses.
PV System Connection
Details technical data for the PV system connection, including rated current, power, and conductor cross-section.
Generator Connection
Lists technical data for generator connection, including input power, current, and maximum fuse link.
Contact
Information required for technical problems
Lists essential information needed by the SMA Service Line to assist with technical issues.
Contact Information by Region
Provides contact details for SMA Service Centers in various countries and regions.

Table of Contents