Mixergy 210 Installation And Servicing Instructions

For stainless steel hot water cylinders

Advertisement

®
Installation and servicing instructions MDC0001
For stainless steel hot water cylinders
Mixergy Ltd
2 Canal View
Wharf Farm
Cassington
Oxfordshire
Please leave with householder
OX29 4DB
Failure to install and maintain this system in accordance with
V14 07/04/21
these instructions will invalidate the manufacturer's warranty.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 210 and is the answer not in the manual?

Questions and answers

Summarization of Contents

Cylinder details
MX number identification
Details on locating the cylinder's unique MX number for identification and queries.
Installation general guidelines
Cylinder positioning and space requirements
Guidance on cylinder placement, ensuring access for maintenance and meeting space requirements.
Electrical installation guide
External wiring overview
Details on connecting external cables for supply, timer control, and indirect control signals.
Supply cable connection details
Instructions for connecting the 3-core 'supply' cable to the household's peak supply.
Timer and indirect control wiring
Wiring for timer integration and indirect control signals for boilers/heat pumps.
Electrical installation: Indirect wiring
Indirect wiring overview
Instructions for wiring Mixergy indirect cylinders into S-plan and Y-plan heating configurations.
S-plan wiring configuration
Specific wiring instructions for S-plan heating configurations using a 2-port zone valve.
Y-plan wiring configuration
Specific wiring instructions for Y-plan heating configurations with 3-port and 2-port valves.
Electrical installation: External controller
External controller wiring
Connecting the timer control cable to an external controller for DHW ON/OFF signals.
Electrical installation: PV diverter
PV diverter wiring guide
Wiring instructions for connecting the cylinder to a third-party PV diverter system.
Connectivity installation: Powerline adapter
Installing the powerline adapter
Steps to connect the cylinder to the internet using a powerline adapter.
Connectivity installation: Ethernet
Hardwiring ethernet connection
Guide to establishing a wired internet connection by replacing the ethernet cable.
Discharge pipework: Safety devices
Discharge pipes from safety devices
Requirements for discharge pipes from relief valves, including material and diameter.
Tundish installation guidelines
Guidelines for positioning and installing the tundish for safe discharge visibility.
Discharge pipework: Arrangements
Typical discharge pipe arrangement
Diagram illustrating the standard setup for discharge pipework from safety devices.
Sizing discharge pipe D2
Table detailing minimum sizes for discharge pipe D2 based on valve outlet size.
Discharge pipework: D2 requirements
Discharge pipe D2 specifications
Specifications for discharge pipe D2, including material, fall, and sizing considerations.
Discharge pipework: Connections
Connecting to soil discharge stack
Rules for connecting discharge pipes to soil stacks and requirements for plastic pipes.
Discharge pipework: Termination
Termination of discharge pipe
Acceptable arrangements for terminating discharge pipes safely and visibly.
Commissioning: initial setup
Filling and flushing the cylinder
Steps for filling the cylinder with water and ensuring all air is expelled.
Testing safety valves
Procedure to test the functionality of pressure and temperature relief valves.
Cylinder operation check
Instructions for switching on and verifying the cylinder's operation and eco mode.
Commissioning: advanced settings
Changing heat sources
Methods to switch the primary heat source between direct, indirect, and heat pump.
Status LED error codes
Explains the meaning of different LED status indicators for troubleshooting.
Commissioning: network connection
Pairing cylinder to network
Steps to pair the cylinder with a powerline adapter or existing network.
Commissioning checklist: final checks
Cylinder primary settings verification
Checks for sealed/vented circuits and system pressure settings.
Unvented cylinders checks
Verification of P&T relief valve, cut-out device, and expansion vessel.
Final system checks and demonstration
Checklist for filling, wiring, connectivity, and customer demonstration.
Troubleshooting: common issues
Overheated water issues
Actions to take in case of overheated water discharge and contacting an engineer.
Water discharge troubleshooting
Diagnosing water discharge from expansion vessel or PRV issues.
Electrical fault diagnosis
Guidance for suspected electrical faults with the controller.
Troubleshooting: component checks
Expansion vessel check and recharge
Procedure for checking and recharging the expansion vessel pressure.
Safety valve troubleshooting
Steps to identify and replace faulty safety valves.
Immersion heater troubleshooting
Troubleshooting non-heating immersion heaters, including electrical faults.
Servicing and maintenance guide
Annual service checks
Routine maintenance tasks including checking relief valves, strainer, and expansion vessel.
Disassociating user account
Procedure for changing the user account associated with the cylinder.

Table of Contents