Sign In
Upload
Download
Add to my manuals
Delete from my manuals
Share
URL of this page:
HTML Link:
Bookmark this page
Add
Manual will be automatically added to "My Manuals"
Print this page
×
Bookmark added
×
Added to my manuals
Manuals
Brands
Mustee Manuals
Shower Cabins
DUR AWALL 748-34
Installation instructions manual
Mustee DUR AWALL 748-34 Installation Instructions Manual
Shower walls
Hide thumbs
1
2
3
4
5
6
7
8
9
10
11
12
page
of
12
Go
/
12
Bookmarks
Advertisement
Quick Links
Download this manual
Previous
Page
Next
Page
1
2
3
4
5
Advertisement
Need help?
Do you have a question about the DUR AWALL 748-34 and is the answer not in the manual?
Ask a question
Questions and answers
Related Manuals for Mustee DUR AWALL 748-34
Shower Cabins Mustee DUR AWALL 732 Installation Instructions Manual
Shower walls (12 pages)
Summarization of Contents
Required Tools and Materials for Shower Installation
Shower Installation Preparation Steps
Step 1: Alcove Construction & Rough Plumbing
Step 2: Shower Floor Installation
A. Sub-floor Requirements and Support
Ensure a level and supported sub-floor, using plywood if necessary.
B. Drain Opening and Pipe Preparation
Cut a 5-inch square opening for the drain and prepare the pipe.
Shower Floor Placement & Drain Sealing
C. Floor Placement and Leveling
Place and level the shower floor, using additional support if needed.
D. Drain Seal Installation
Seal the drain properly with the gasket and sealant.
Step 3: Shower Wall Installation
A. Drilling for Valve and Showerhead
Drill holes in the side panel for controls and showerhead placement.
Shower Wall Panel Prep & Sealing
B. Mounting Flange Drilling and Support
Pre-drill mounting flanges and utilize all holes for structural support.
C. Utilizing All Mounting Holes
Ensure all pre-marked mounting holes are used to prevent structural issues.
D. Silicone Sealant in Grooves
Apply silicone sealant to panel grooves for a watertight seal.
Shower Wall Assembly & Panel Insertion
E. Securing Side Panels and Corner Panel
Insert and secure side panels into the corner panel with clips.
Step 4: Panel Insertion & Sealing
A. Side Panel Insertion
Insert the side panel blade into the corresponding slot in the corner panel.
Panel Contact & Sealing (Step 4)
B. Applying Silicone Sealant to Contact Points
Apply sealant to panel contact points and edges for vibration and sealing.
Final Unit Installation & Finishing
C. Setting Assembled Unit and Securing
Place the unit, compress silicone, and secure with screws, ensuring plumb.
D. Alcove Finishing with Sheetrock
Finish the alcove area with water-resistant sheetrock.
E. Sealing Holes for Fixtures
Apply silicone sealant around holes for handles and showerhead.
Shower Unit Care and Cleaning
Optional Shower Doors Information
One Year Limited Consumer Warranty Details
Installation Questions and Support Contact
Print
Rename the bookmark
Delete bookmark?
Delete from my manuals?
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL
Need help?
Do you have a question about the DUR AWALL 748-34 and is the answer not in the manual?
Questions and answers