Advertisement

User manual and
parts book
Verti-Quake
Model: 2510/2516/2521
Serial number:
ATTENTION:
TO ENSURE SAFE USE OF THIS MACHINE AND TO BE ABLE TO
ACHIEVE THE BEST RESULTS, IT IS OF THE UTMOST IMPORTANCE
TO READ THIS USER MANUAL THOROUGHLY BEFORE USING THE
®
VERTI-QUAKE
.
®
User manual code: 915.120.202, January 2006
Redexim
REDEXIM BV
INTERNATIONAL TRADING
KWEKERIJWEG 8
3709 JA ZEIST HOLLAND
TEL (31) 30 6933227
FAX (31) 30 6933228
VERTI-DRAIN@REDEXIM.COM
WWW.REDEXIM.COM
UK

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Verti-Quake 2516 and is the answer not in the manual?

Questions and answers

Summarization of Contents

FORWARD
WARRANTY CONDITIONS
Warranty against defects in materials, valid for 12 months from purchase date.
REGISTRATION CARD
Card for owner's information, to be filled for claims follow-up and record keeping.
FIRST INSTALLATION, REMOVING THE MACHINE FROM THE PALLET
PREPARE MACHINE FOR OPERATION
Steps to prepare the Verti-Quake® for operation, including securing and coupling to tractor.
THE PTO
LENGTH OF THE PTO
Ensuring correct PTO length is crucial to prevent damage; includes measurement steps.
OPERATION OF THE PTO
Key checks for correct PTO use: angle, alignment, sleeve overlap, and cover integrity.
PTO INFORMATION AND MAINTENANCE
Details on PTO safety device, maintenance schedule, and periodic/annual checks.
MAINTENANCE
CLEANING THE VERTI-QUAKE®
Safe and effective cleaning procedures, avoiding damage to seals and ensuring visibility.
REPLACING THE KNIVES
Procedure for safely removing worn knives and mounting new ones with correct orientation.
OPTIONS: UNDEEP AERATION KIT
OPTIONS: MOUNTING THE COULTER KNIVES
Instructions for mounting coulter knives to keep cut grooves open after aeration.

Table of Contents