Download Print this page
GNE Swarm Installation & User Manual

GNE Swarm Installation & User Manual

Gne module level optimization and monitoring system

Advertisement

Quick Links

GNE module level optimization and monitoring system
Installation User Manual
(Honeybee350/400, Honeybee700/800, Scouter450,Swarm, Beehive)
Jiangsu GNE New Energy Technology Co., Ltd.
Tel:+86 519 8728 1798
Email:
service@gnetek.com
|
Web:www.gnetek.com
Add.: 1F/B, No.218 Hongkou Road, Liyang City, Jiangsu 213300, CHINA

Advertisement

loading
Need help?

Need help?

Do you have a question about the Swarm and is the answer not in the manual?

Questions and answers

Summarization of Contents

Register MACID of GNE Models
Plan Installation Location
Determine the physical placement for each power optimizer or PV module monitor.
Record MACIDs
Document the 8-digit MACID of optimizers, Swarm, and Beehive on site maps.
Install According to MACID Order
Mount optimizers and monitors according to the pre-recorded MACID sequence.
Installation of Optimizers or PV Monitors
Precautions Before Installation
Essential safety measures and preparations before commencing optimizer installation.
Correct Installation Connection
Ensures optimizer outputs are connected in series with correct polarity.
Connector Attention
Highlights the importance of proper connection of the 6 connectors.
Setup in Data Cloud Center (Honeypot)
New Account Register
Steps to create a new user account for the GNE data cloud center.
Fill In New Account Information
Details required to complete the new user account registration form.
Inverter and Panel Information Setup
Entering details of inverters and PV panels into the system.
Beehive MACID Entry
Inputting the 8-digit MACID for the Beehive device.
Optimizer MACID and Model Selection
Selecting optimizer models and entering their 8-digit MACIDs.
Adjust Optimizer Location
Mapping optimizer positions to the physical layout of the PV station.