Advertisement

Quick Links

G2
L I N E A R AC C E N T
Installation Guide
Model
G21210BTGR33AWH/BK
G21210BTNFL33AWH/BK
G21210BTFL33AWH/BK
G21210BTWFL33AWH/BK
G21207BTGR33AWH/BK
G21207BTNFL33AWH/BK
G21207BTFL33AWH/BK
G21207BTWFL33AWH/BK
G21204BTGR33AWH/BK
G21204BTNFL33AWH/BK
G21204BTFL33AWH/BK
G21204BTWFL33AWH/BK

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the G2 Series and is the answer not in the manual?

Questions and answers

Summarization of Contents

Installation
Connect Fixtures
Connect linear fixtures end-to-end, use jumper cables, and affix to surface.
Attach Terminator
Insert the terminator plug into the output connector of the last fixture in the run.
Connect Leader Cable
Connect the leader cable to the N3 Satellite and the first fixture.
Apply Power at Source
Refer to N3 Satellite guide for instructions to apply power to N3 Satellite.
Verify Successful Installation
Apply power to the circuit and check LEDs for status.
Aim Fixtures
Rotate fixtures to aim the beam using the geared constant-torque hinge.
Address Fixtures and Program Content
Use Ketra's Design Studio Software to address and configure the products.

Table of Contents