Cambridge Engineering S1600 Technical Manual

Direct gas-fired industrial blow-thru space heater

Advertisement

INDUSTRIAL BLOW-THRU
Improper installation, adjustment, alteration, service or maintenance can cause property dam-
age, injury or death. Read the installation, operating, and maintenance instructions thoroughly
before installing or servicing this equipment.
The use and storage of gasoline or other flammable vapors and liquids in open containers in
the vicinity of this appliance is hazardous.
FOR YOUR SAFETY
If you smell gas:
1. Open windows.
2. Don't touch electrical switches.
3. Extinguish any open flame.
4. Immediately call your gas supplier.
Made in the USA
S-SERIES
DIRECT GAS-FIRED
TECHNICAL MANUAL
mWARNING:
FOR YOUR SAFETY
SPACE HEATER
®
®
ASHRAE
ASHRAE
90.1
COMPLIANT
COMPLIANT
®
S-TM7-02-18
S400-S3200 REV. F

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the S1600 and is the answer not in the manual?

Questions and answers

Summarization of Contents

Hazard Summary and Safety Information
Hazard Identification and Warnings
Defines hazard levels and general safety warnings.
Installation Location Guidelines
Specifies installation requirements for special locations.
Typical System Overview
Accessory Identification
Identifies and illustrates system components and accessories.
Heater Operation and Configuration
Explains heater function and shows internal component layout.
Installation Instructions
Uncrating and Mounting Location
Steps for unpacking and selecting a suitable installation site.
Roof Top Mounting Options
Details for curb/stand/rail, general roof top, and roof/thru wall mounting.
Wall and Under Roof Mounting
Instructions for under roof, thru wall, and vertical mounting.
Inlet Skirt and Utility Connections
Inlet skirt installation, gas piping, and electrical wiring.
Start-Up and Calibration Procedures
Start-Up Procedure Overview
Lists steps for initial equipment start-up.
Pre-Start-Up Checks and Adjustments
Covers visual, electrical, gas, blower, and burner checks.
Leak Checks and Final Preparation
Gas train, valve leak checks, and final system setup.
Control System Calibration
Step-by-step calibration for EDL, EDSM/TP, and EDR systems.
Operating Instructions
Operating Sequence Overview
Explains the step-by-step operational sequence.
Electronic Thermostat (OET) Operation
Details on setting temperatures and calibration for OET.
TSS Controller Operation and Scheduling
Operating, programming, and scheduling the TSS controller.
Maintenance Instructions
Lubrication and Filter Service
Guidelines for bearing lubrication and filter maintenance.
Belt Tensioning and Blower Cleaning
Procedures for belt adjustment and blower wheel cleaning.
Burner and Gas System Maintenance
Burner cleaning and gas train leak checks.
Gas Valve Cleaning
Detailed steps for cleaning ASCO gas valves.
Troubleshooting Instructions
Troubleshooting Guide Overview
A systematic approach to diagnosing and resolving issues.
Blower, Heat, and Flame Issues
Diagnoses problems with blower, heat, and flame detection.
Cycling, Control, and Valve Issues
Resolves issues with cycling, thermostats, and modulating valves.
Reference Information
Electrical Diagrams
Isometric, wiring, and connection diagrams for electrical systems.
Gas Train Drawings
Visual representations of gas train configurations.
Individual Component Descriptions
Remote Control Stations and Systems
Descriptions of RCS-S, TSS, and related components.
Gas Control Systems and Components
Details on EDL, EDR, EDSM, and associated gas control parts.
Heater Components and Controls
Explains airflow switches, damper motors, fuses, and PC boards.

Table of Contents

Save PDF