Download Print this page

Advertisement

Quick Links

16555 East Gale Avenue
City of Industry, CA 91745
626.968.5666
www.aal.net
KicK Bollard Installation Instruction
Fixture: KB6 - KicK Bollard
WARNING : Fixtures must be grounded in accordance with local codes or the National Electrical
!
Code. Failure to do so may result in serious personal injury.
MAINTENANCE : A regularly scheduled maintenance program should be established to retain optimum light
output and reduce heat retention.
CAUTION : All wiring must be done by a qualified electrician. KEEP THIS SHEET FOR FUTURE REFERENCE.
93069784 REV. B
2
1
A R C H I T E C T U R A L
Tools required:
1. 9/16" Socket & Rachet Arm
2. Wire connections to incoming power (others)
3. 3/16" Allen Wrench
2
1
93069764
1
4
A90007
ITEM # QTY
PART #
PAGE 1/8
A R E A
L I G H T I N G
TMPLT-MTG-KB6
BOLT-ANCH 1/2 x10 x2
DESCRIPTION

Advertisement

loading
Need help?

Need help?

Do you have a question about the KB6 and is the answer not in the manual?

Questions and answers

Summary of Contents for Architectural Area Lighting KB6

  • Page 1 16555 East Gale Avenue City of Industry, CA 91745 626.968.5666 www.aal.net KicK Bollard Installation Instruction Fixture: KB6 - KicK Bollard WARNING : Fixtures must be grounded in accordance with local codes or the National Electrical Code. Failure to do so may result in serious personal injury. MAINTENANCE : A regularly scheduled maintenance program should be established to retain optimum light output and reduce heat retention.
  • Page 2 16555 East Gale Avenue City of Industry, CA 91745 626.968.5666 www.aal.net KicK Bollard Installation Instruction Fixture: KB6 - KicK Bollard REMOVE SET SCREWS 1. Remove 4 x 3/8-16 set screws. 2. Remove the fixture housing by pulling the housing upward. FIXTURE HOUSING FIG.
  • Page 3 16555 East Gale Avenue City of Industry, CA 91745 626.968.5666 www.aal.net KicK Bollard Installation Instruction Fixture: KB6 - KicK Bollard REMOVING BOLLARD BASE 1. Remove 4 x 3/8-16 screws and washers from the bollard base, and remove the fixture assembly. FIXTURE ASSEMBLY 3/8-16 SCREWS 3/8-16 WASHERS...
  • Page 4 16555 East Gale Avenue City of Industry, CA 91745 626.968.5666 www.aal.net KicK Bollard Installation Instruction Fixture: KB6 - KicK Bollard INSTALLING BOLLARD BASE 1. Placed the anchor bolt template on the desired location, and install the anchor bolt according to the determined location. 2.
  • Page 5 16555 East Gale Avenue City of Industry, CA 91745 626.968.5666 www.aal.net KicK Bollard Installation Instruction Fixture: KB6 - KicK Bollard WIRING CONNECTION 1. Make the wiring connection, see wiring diagram on page 6 for detail information. FIG. 2-1 FIG. 4-1 PAGE 5/8 A R C H I T E C T U R A L A R E A...
  • Page 6 16555 East Gale Avenue City of Industry, CA 91745 626.968.5666 www.aal.net KicK Bollard Installation Instruction Fixture: KB6 - KicK Bollard KicK Bollard Wiring Diagram GROUND TO FIXTURE HOUSING TO NTC PROBE BLACK BLACK BLUE BLUE TO INCOMING GREEN GREEN POWER BLUE BLUE WHITE...
  • Page 7 16555 East Gale Avenue City of Industry, CA 91745 626.968.5666 www.aal.net KicK Bollard Installation Instruction Fixture: KB6 - KicK Bollard INSTALLING FIXTURE ASSEMBLY 1. Determine the street side desired, and install the fixture assembly to the bollard base. 2. Install 4 x 3/8-16 screws and washers to the bollard base to secure the fixture assembly to the bollard base.
  • Page 8 16555 East Gale Avenue City of Industry, CA 91745 626.968.5666 www.aal.net KicK Bollard Installation Instruction Fixture: KB6 - KicK Bollard INSTALLING THE FIXTURE HOUSING 1. Insert the fixture housing to the bollard fixture assembly. 2. Insert 4 x 3/8-16 set screws, and tighten the set screws on all 4 sides.
  • Page 9 16555 East Gale Avenue City of Industry, CA 91745 626.968.5666 www.aal.net KicK Bollard Installation Instruction Fixture: KB6 - KicK Bollard BOLT PATTERN TEMPLATE PAGE 1/8 A R C H I T E C T U R A L A R E A L I G H T I N G 93069784 REV.