OPERATION AND MAINTENANCE
DOCUMENTATION
FOR THE
BOILER OF
„PID" TYPE
Translated by

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PID 20 and is the answer not in the manual?

Questions and answers

Summarization of Contents

Installation Guidelines
Setting of the Boiler
Details on boiler placement, clearances, and leveling for optimal operation and maintenance.
Ventilation Requirements
Specifies ventilation needs for the boiler room, including air supply and exhaust dimensions.
Connecting to Chimney
Guidelines for connecting the boiler flue to the chimney, emphasizing flue pipe material and chimney height.
Connecting to Central Heating System
Instructions for connecting the boiler to the heating system, including pipe flushing and valve recommendations.
Filling the Boiler with Water
Procedures for filling the boiler and heating installation with water, including safety norms.
Electrical Installation
Requirements for the electrical installation and control panel, emphasizing safety and power supply.
Starting the Boiler
Connecting Pumps
Details on connecting circulation and tap water pumps, requiring a licensed electrician.
Operating Temperature
Recommended operating temperatures to prevent condensation, corrosion, and tar buildup.
Startup Procedure
Step-by-step guide for firing up the boiler, including fuel addition and controller operation.
Cleaning
Procedures for cleaning the boiler to maintain efficiency, including smoke channels and furnace plates.