Download Print this page
biopod TERRA Setup Manual

biopod TERRA Setup Manual

The smart microhabitat

Advertisement

Quick Links

Biopod Setup Guide Large.pdf
C
M
Y
CM
MY
CY
CMY
K
1
2016-12-27
11:46 PM

Advertisement

loading
Need help?

Need help?

Do you have a question about the TERRA and is the answer not in the manual?

Questions and answers

Summarization of Contents

Biopod Warranty and Terms of Use
Warranty Coverage and Exclusions
Details what is covered by the Biopod warranty and lists specific exclusions.
Obtaining Warranty Service
Explains the process for requesting warranty service, including available options and user responsibilities.
Legal and Liability Limitations
Outlines warranty limitations, consumer law relation, and Biopod's liability caps.
Part 1: Unboxing
Unboxing Procedure
Step-by-step guide for unpacking Biopod components and verifying all parts are present.
Part 2: Tube Routing & Base Assembly
Base Assembly and Serial Number
Instructions for assembling the base and locating the essential motherboard serial number.
Cable and Tube Routing
Guides on routing cables and tubes through the base, including specific connections for misting.
Misting Tube Connection
Detailed steps for connecting the misting tubes to the pump and routing them through the base.
Aeration Tube Connection
Instructions for connecting the aeration tubes and one-way air valve to the aeration pump.
Part 3: Cable Insertion and Inner Tank
Inner Tank Component Insertion Overview
General guidance on inserting various components into the Biopod tank, noting model differences.
Stopper and Elbow Connections
Detailed steps for inserting stoppers and connecting elbows for irrigation and misting systems.
Additional Stopper Installation
Continues the process of inserting stoppers into specific holes for various cables and tubes.
Air System and Sensor Cable Installation
Connects airstone and installs ventilation/NTC sensor cables with stoppers.
Substrate Heating Cable Installation
Installs substrate heating cable and remaining stoppers into designated holes.
Manifold Pipes and Elbow Connections
Connects manifold pipes and PUL10 elbows to the base, ensuring water-tight seals.
Part 2: Installing the Living Wall
Living Wall Installation Overview
Introduces the living wall installation, noting potential shipping disassembly and model variations.
False Bottom Preparation for Installation
Instructions for preparing false bottoms by breaking specific plastic portions for different Biopod models.
Fitting False Bottoms to PLJ08
Guidance on fitting the prepared false bottoms, including breaking fins if necessary for component clearance.
Ventilation Tube Routing and Connection
Connects and routes ventilation tubes through the base for different Biopod models.
Securing Ventilation Tubes and False Bottoms
Uses suction cups to secure ventilation tubes and connectors to fix false bottoms in place.
Substrate Heating Cable and Fin Management
Routes substrate heating cable and advises on breaking false bottom fins for cable management.
Living Wall Cap and Vertical Tube Connection
Attaches the living wall cap and connects the vertical tube to the PLJ08 elbow and living wall.
Securing the Living Wall in Place
Pushes the living wall back and secures it into previously installed connectors, noting irreversibility.
Aqua Model Specific False Bottoms
Details breaking the Aquabase cover and placing final false bottoms for the Aqua model.
Part 4: Outer Assembly, Cable & Tube Routing
Upwards Extension & Reservoir Installation
Routes cables upwards through back pieces and extensions, preparing for reservoir installation.
Misting Pump and Reservoir Assembly
Connects the misting pump reducer and secures the water reservoir into the back piece cup.
Reservoir Leak Check and Extension Addition
Checks reservoir for leaks and adds remaining extensions, routing cables to tank height.
Topglass and Canopy Installation
Installs the Topglass and canopy piece, including feed tabs, onto the Biopod frame.
Routing Cables Through Canopy Corners
Guides on routing cables through canopy corners and into the LED light and other connectors.
Misting Nozzle Installation and Sealing
Installs misting nozzles and canopy supports, ensuring tight fitting and water-tight seals.
Securing Misting Nozzles and LED Connection
Screws washers into misting nozzles and connects the LED cable to the light.
Camera and Sensor Housing Installation
Connects camera cable to PCB, installs camera housing and humidity/temp sensor housing.
Securing Topglass and Canopy Fitment
Secures the Topglass using tabs and pushes down canopy corners to lock into extension pieces.
Manifold Piece Air Delivery
Inserts the black manifold piece into ventilation pipes and fan opening for air delivery.
Final Steps and Support
Completing Setup and Leak Check
Connects power, completes tank setup, and recommends a leak check with water.
UVB Bulb and Advanced Setup
Information on the UVB bulb and guidance on planting, aquascaping, and app setup.
FCC Warning
FCC Compliance and RF Exposure
Details FCC rules compliance, interference, and RF exposure limits for the device.