NBE RTB 16 Manual

NBE RTB 16 Manual

Pellet boiler

Advertisement

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the RTB 16 and is the answer not in the manual?

Questions and answers

Summarization of Contents

The Clean Air Act 1993 and Smoke Control Areas
Fuel
Specifies the recommended fuel for Robus RTB pellet boilers, emphasizing ENplus A1 grade wood pellets.
What is ENPlus?
Explains ENPlus as the European Quality Standard for wood pellet manufacture and supply.
SPECIFICATIONS BOILER & VAC
BOILER AND HOPPER
Details dimensions and capacity for boiler and hopper units of different RTB models.
BOILER ROOM
General boiler room construction.
Requirements for boiler room environment: dry, dust-free, well-lit, and safe for operation.
Floor & wall construction.
Specifies non-combustible floor and wall materials around the boiler area for safety.
Boiler clearances.
Recommended clearances around the boiler and hopper for maintenance and cleaning access.
ELECTRICAL SYSTEM
Wiring diagram V7 & V10
Illustrates the wiring connections for the V7 and V10 boiler control systems.
FIRST TIME START UP
Step 1: Weighing the pellets
Guides on calibrating the external auger by weighing wood pellet delivery for accurate measurement.
Step 2: Adjusting the Fan
Instructions for adjusting fan settings to achieve optimal O2 and CO2 readings for efficient combustion.
CLEANING THE BURNER & BOILER
Boiler.
Instructions for cleaning the interior surfaces of the boiler, including ash removal.
Burner head.
Procedure for cleaning the burner head, grate, and photo sensor for optimal performance.
Hopper.
Guidance on periodically emptying the hopper to prevent dust accumulation affecting pellet supply.
FLUE GAS CONDENSATION
Things that can prevent condensation forming in the boiler and chimney.
Lists factors and conditions that help prevent flue gas condensation in the boiler and chimney.
WARRANTY
Boiler vessel warranty.
Details the two-year manufacturer's parts warranty for the boiler vessel under specific installation conditions.
Extended warranty.
Outlines conditions for extending parts warranty to 3 years and boiler vessel warranty to 10 years.

Table of Contents

Save PDF