Woodsman Brunner MKII Installation Instructions Manual

Woodsman Brunner MKII Installation Instructions Manual

Solid fuel burners

Advertisement

Specifications and Installation
Instructions for Woodsman Solid Fuel
The installation of any Woodsman solid fuel burner requires a Building
Consent prior to installation commencing. We recommend the installation
of a Woodsman solid fuel burner or flue system be undertaken by the
holder of a current SFAIT (Solid Fuel Appliance Installation Technician)
qualification issued by the NZHHA (NZ Home Heating Association Inc.).
Proudly Manufactured By:
Burners
www.nzhha.co.nz
Harris Home Fires
41 Braddon St
Addington
Christchurch 8024
New Zealand
Email sales@hhf.co.nz
Issued: April 2015 V2.64
P O Box 4043
Christchurch 8140
New Zealand
Phone 03 366 1796
Freephone 0800 3661796
Fax 03 366 1795
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Brunner MKII and is the answer not in the manual?

Questions and answers

Summary of Contents for Woodsman Brunner MKII

  • Page 1 The installation of any Woodsman solid fuel burner requires a Building Consent prior to installation commencing. We recommend the installation of a Woodsman solid fuel burner or flue system be undertaken by the holder of a current SFAIT (Solid Fuel Appliance Installation Technician) qualification issued by the NZHHA (NZ Home Heating Association Inc.).
  • Page 2: Table Of Contents

    Contents PAGE Testing and Certification Clearances 4 & 5 Flue Shields Ceiling Heights Flue Shield Deflector Floor Protector/Hearth Graph (Graph 1) Rear Deflector Dimensions Reducing Clearances Installation Instructions Floor Protector Materials Minimum Flue Height Flue Installation Details Sealing Flue Joints Fitting The Wetback To The Firebox...
  • Page 3: Testing And Certification

    AS/NZS AS/NZS ECan Cert MODEL 2918:2001, 2918:2001, 4012:1999 4013:1999 Number APP B APP E ECR NoVo Complies 0.9g/kg 153733 ECR NoVo Wet Complies 0.9g/kg 155148 Totara Complies Complies 0.9g/kg 110220 Matai ECR MkIII Complies 0.7g/kg 102148 Matai ECR MkV Complies 0.7g/kg...
  • Page 4: Clearances 4

    ECR MkIII, ECR NoVo MkIV, MkV With Rear Deflector ASPEN STRONGMAN Fitted (see Page 7) 875* GRAPH 1 1233** 1015 1084 1364...
  • Page 5 Minimum Safe Installation Clearances to COMBUSTIBLE Materials Totara 1060* Graph 1 Graph 1 Graph 1 Graph 1 * Dimension P can be 920mm with a factory supplied heat deflector fitted...
  • Page 6: Flue Shields

    Ceiling Heights All Woodsman free standing fires have been tested and approved to ASNZ 2918:2001 App B with a ceiling height of 2.4m and with the factory flue shield fitted in the below configurations. In some cases, the top of the flue shield terminates within 600mm of the ceiling height (refer to ASNZ 2918:2001 4.5.2) but all ceiling temperatures did not ex-...
  • Page 7: Floor Protector/Hearth Graph (Graph 1)

    2 riv- ets in the predrilled holes. The rear deflector should be positioned tight up against the flue shield as shown. Available for: Brunner MKII, Tasman MKII, ECR NoVo & Tarras MKIII...
  • Page 8: Dimensions

    Dimensions TOTARA FLARE FLARE STRONG- BRUNNER TARRAS MKIII, V NoVo MKII & MKIII WOOD MULTI Deluxe TASMAN MKII Overall Stove Width Stove Depth Door Frame to Rear Overall Stove Depth Ledge to rear Overall Stove Height Insert Fascia Height Insert Depth Insert Maximum Height Insert Fascia Width...
  • Page 9: Reducing Clearances

    Two spaced layers of 12mm + 12mm continuous material Unshielded Dimension for Woodsman Tarras MKII Rear Clearance - 198mm (combustible to stove) Heat shield with 25mm air gap with Woodsman Tarras MKII Heat Shield - Single layer of continuous material with 25mm air gap.
  • Page 10: Installation Instructions

    (or equivalent) FLARE (All Variants) 8mm ceramic tiles only ECR (MkIII, IV, V) (or equivalent) TOTARA* STRONGMAN 24mm Eterpan LD (or equivalent) BRUNNER MKII Ash Floor Protector. TASMAN MKII Any non-combustible TARRAS MKIII material of any thickness ECR NoVo...
  • Page 11: Minimum Flue Height

    Flue Installation Detail Your Woodsman appliance should be installed with a HeatSaver Flue System. A HeatSaver Flue System is available from all authorised Woodsman dealers throughout New Zea- land. The HeatSaver Flue System contains a complete installation drawing and correct clearances from the ceiling level up.
  • Page 12: Sealing Flue Joints

    Sealing Flue Joints IMPORTANT All Flue Joints Are Required To Be Sealed Using Flue Cement It is extremely important that ALL flue joints are sealed at the time of installation using flue cement or a suitable exhaust cement. If flue joints are not sealed properly, it can lead to performance issues with the fire such ...
  • Page 13: Fitting The Wetback To The Firebox

    Fitting the Wetback To The Firebox Instructions for fitting a loose wetback to the firebox where the fire has been pre-punched with wetback holes. Remove knock-outs and cover plates in the rear panels  Remove top rear firebrick  Undo coach bolts on firebox plug to expose wetback holes ...

Table of Contents