MAX power CT45 Installation Operation & Maintenance

MAX power CT45 Installation Operation & Maintenance

Bow thruster

Advertisement

Last update: December 2013
Manual CT35 & CT45
CT35 / CT45
With electronic thruster control
INSTALLATION OPERATION MAINTENANCE
Serial No.: ------------------------------------------------------
Installation date: -------------------------------------------------
THIS MANUAL MUST BE KEPT ONBOARD AT ALL TIMES
Via Philips 5, 20900 Monza (MI), Italy
Tel. +39 039 200 1973-936 - Fax +39 039 2004299
www.max-power.com
E-mail:contact@max-power.com
www.max-power.com

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the CT45 and is the answer not in the manual?

Questions and answers

Summarization of Contents

Electric Motor and Propeller Installation
Protection Grills
Details on optional protection grills and their impact on thruster performance.
Electrical Installation Basics
Essential guidance for correct electrical connections to prevent damage and ensure reliability.
Power Fuse and Battery Specifications
Power Wiring and Cable Selection
Guidelines for choosing appropriate cable sizes based on length for optimal power transmission.
System Testing and Electrical Measurements
Thruster Operation and Runtime Limits
Instructions on safe thruster operation and maximum permissible running times.
Troubleshooting Common Issues
Worldwide Distributor Network
Information on finding local Max Power distributors for assistance and service.
Understanding Warranty Coverage
Warranty Definitions Glossary
Definitions of key terms used throughout the warranty documentation.
Warranty Period of Coverage
Details the duration of the manufacturer's guarantee for the equipment.
Warranty Registration Guide
Steps to follow for registering the product to activate extended warranty benefits.
Warranty Terms and Claim Procedures
Warranty Exclusions and Limitations
Outlines conditions and damages that are specifically not covered by the warranty.

Table of Contents