Page 20
Punch positioning method 1: Use a tape measure to measure the hole position and punch holes. 6cm/2.36in 35.2cm/13.85in 93.1cm/36.65in 35.2cm/13.85in Punch positioning method 2: Position the TV cabinet on the wall, place a level to ensure that the TV cabinet is parallel, then punch holes.
Need help?
Do you have a question about the TVS001-BK180-RR and is the answer not in the manual?
Questions and answers