Anbull e-5k Operating Instructions Manual

High pressure aerator

Advertisement

Quick Links

Operating Instruction of New Model High Pressure Aerator
Thank you very much for choosing us. The new and good-looking machine will bring you a very
safe, quiet and clean working environment. Meanwhile, Our team will provide you with the best
service. When you opening the box, please check whether the accessories are complete against the
packing list. if you have any questions, please contact your sales manager timely to reduce your loss.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the e-5k and is the answer not in the manual?

Questions and answers

Summary of Contents for Anbull e-5k

  • Page 1 Operating Instruction of New Model High Pressure Aerator Thank you very much for choosing us. The new and good-looking machine will bring you a very safe, quiet and clean working environment. Meanwhile, Our team will provide you with the best service.
  • Page 2: Spanner

    Packing list 1 Manual 1 pc 2 Power Cord 1 pc( Please make sure if the power plug is suitable for local outlet) 3.High Pressure Outlet Hose 1 pc ( Quick connector is available on 2 ends. Testing Plug is on 1 end.) 4.High Pressure Pumps 1 unit 5.
  • Page 3: Table Of Contents

    spanner rings plate 12-14O pen-end 40 outer piston 2nd level pistion spanner rings spring Outer screwdriver dia.16*1.8sealing anti bursting film ring Outer dia Discharge valve Needle grease 16*1.5sealing sealing washer 垫 ring 6mm inner sealing S2 hex key spanner φ7concial spring sleeve S2.5 Hex key Outer dia.10.*1.2...
  • Page 4 high-pressure outlet , start the machine and run for 5 minutes. Connect the quick joint of the high pressure hose to the high pressure outlet of the machine, screw and close the vent valve while the machine is running, and observe the pressure gauge. It is normally takes 20 seconds from 0 to 4500Psi.
  • Page 5 Please twist grease injector for 1 bar after machine working for 4 to 6 hours .If inject too VII : much grease it would be affect the quality of the gas. Frequently questions and solution: Plug in the power toggle switch but the indicator light of the machine is not on, and it will not start.--------As the pin plug is a standard part, you can use other electrical appliances with the pin plug to test whether the cable is in good condition.
  • Page 6: Outer

    Name Name Name Name outer 6mm inner sealing Back side panel dia.30*1.5sealing 6*24flat key sleeve ring 1st level cylinder 2nd level piston sealing base Crank case sleeve spring base locating pad outer Tracheal tube Wave spring M10 vent cap dia.16*1.8sealing...
  • Page 7: Sealing Ring

    ring 2nd level cylinder 40taper washer Sealing socket baseboard sleeve level cylinder 40conical washer High pressure rod wheel sleeve outer M8*19outer hex Oil cylinder screw 2nd level piston dia40*2sealing ring screw 2nd level piston 1st level valve Oil cylinder Universal wheel spring space ring outer...
  • Page 8 washer dia.40*2sealing ring outer M6*130 inner hex 4mm steel ball 33inner piston ring dia.9*1.5sealing socket screw ring outer 4.2*15 spring 33taper washer dia.8.8*1.5sealing filter tube ring 12mm complex wave spring M6flat washer filter board washer dead plate pressure output connector Connecting rod wool pad ring...
  • Page 9 water location sealing base spring conversion shaft cooling fan outer fan protective high pressure tube dia.10*1.2sealing Two stage crankcase screening ring M8*130inner hex Inner liner 6mm taper washer socket screw Circuit diagram; 启动:start 停止:off 压力表 pressure gage 控制板 control board 计时器 timer over current switch 水泵...

This manual is also suitable for:

5k2

Table of Contents