Download Print this page

DAE SMB 1P2W Manual

(1 hot wire 1 neutral) 120v breakers from 1p3w (2 hot wire 1 neutral)

Advertisement

Quick Links

Fuse
A
B
A
www.daecontrol.com
SMB 1P2W (1 hot wire 1 Neutral) 120V
breakers from 1P3W (2 hot wire 1 neutral)
22 AWG is good enough for all the wires. SMB350 uses very
low power.
One fuse with holder is attached for you to connect the hot wire to
power the meter. VA, VB, VC just take the reference of voltage from
hot wire A, B, C. They do not need fuse.
A
B
Monitor 16 breakers for SMB350-8.
Monitor additional 8 breakers (Phase A)
when short-circuit VA and VC.
Monitor 8 breakers for SMB350-4.
Monitor additional 4 breakers (Phase A)
when short-circuit VA and VC.
White:CT+
Black:CT-
info@daecontrols.com, (248) 635 3708

Advertisement

loading
Need help?

Need help?

Do you have a question about the SMB 1P2W and is the answer not in the manual?

Questions and answers

Summary of Contents for DAE SMB 1P2W

  • Page 1 SMB 1P2W (1 hot wire 1 Neutral) 120V breakers from 1P3W (2 hot wire 1 neutral) 22 AWG is good enough for all the wires. SMB350 uses very low power. One fuse with holder is attached for you to connect the hot wire to power the meter.
  • Page 2 SMB 1P2W (1 hot wire 1 Neutral) 120V breakers from 3P4W (3 hot wire 1 neutral) 22 AWG is good enough for all the wires. SMB350 uses very low power. One fuse with holder is attached for you to connect the hot wire to power the meter. VA, VB, VC just take the reference of voltage from hot wire A, B, C.
  • Page 3 1P2W(2 hot wire), 208V (AB,BC circuits) breakers from 3P3W (3 hot wire no neutral) 22 AWG is good enough for all the wires. SMB350 uses very low power. One fuse with holder is attached for you to Fuse connect the hot wire to power the meter. VA, VB, VC just take the reference of voltage from hot wire A, B, C.
  • Page 4 SMB 1P2W (2 hot wire) 208V (CA circuit) breakers from 3P3W (3 hot wire, no neutral) 22 AWG is good enough for all the wires. SMB350 uses very low power. One fuse with holder is attached for you to Fuse connect the hot wire to power the meter.
  • Page 5 SMB 1P2W (2 hot wire) 240V breakers from 1P3W (2 hot wire 1 neutral) One CT at A phase, CT is not required at B phase 22 AWG is good enough for all the wires. SMB350 uses very low power.
  • Page 6 1P2W(2 hot wire), 480V, 600V (AB,BC circuits) breakers from 3P3W (3 hot wire no neutral) 22 AWG is good enough for all the Please connect wires. SMB350 uses very low power. 120V or 240V One fuse with holder is attached for you to from another panel connect the hot wire to power the meter.
  • Page 7 3P3W (3 hot wire, no Neutral) - 208V 22 AWG is good enough for all the wires. SMB350 uses very low power. One fuse with holder is attached for you to connect the hot wire to power the meter. Fuse VA, VB, VC just take the reference of voltage from hot wire A, B, C.
  • Page 8 3P3W (3 hot wire, no Neutral) - 480V, 600V 22 AWG is good enough for all the wires. SMB350 uses very low power. Please connect One fuse with holder is attached for you to 120V or 240V connect the hot wire from another panel to from another panel power the meter.
  • Page 9 3P4W (3 hot wire, 1 Neutral) 120/208V, 277/480V, 346/600V 22 AWG is good enough for all the For monitoring 277/480V or wires. SMB350 uses very low power. 346/600V panel, please connect 120V or 240V One fuse with holder is attached for you to from another panel to power connect the hot wire to power the meter.