Page 1
Installation Guide HotLok Switchfix ® Part Numbers SF001-PD1 SF001-PS1 Each carton contains: Switchfix chassis (1), Adjustable Channel Arms (2), Channel Guides (2), Installation Guide (1) Tools and Preparation Required for Installation Tools Required: Phillips Screwdriver Hardware Required: 10x32 Cage Nuts (4-8), 10x32 Screws (4-8) Specifications Quantity per Shipping...
Page 2
Installation Guide Installing the SwitchFix Prior to installing the SwitchFix attach the switch power cords to the power supply handle located towards the center of the switch. Attach the rear channels to the rear rack rails by installing two cage nuts to the inside of each square punched mounting hole.
Page 3
If you have any questions, please contact us direct at improved. (505) 798-0200, or Toll Free at (888) 982-7800. Email us at info@upsite.com Maintaining Proper Cooling of Equipment Failure to follow computer manufacturer’s guidelines for maintaining proper cooling may result in the overheating of equipment.
Page 4
Limited Warranty Upsite Technologies, Inc. (the Company) warrants to the original purchaser that products delivered hereunder will be free of defects in materials and workmanship for a period of twelve (12) months from the date of purchase (the “Warranty Period”).
Need help?
Do you have a question about the HOTLOK SF001-PD1 and is the answer not in the manual?
Questions and answers