Download Print this page

SunTrends Cabana Bench 8' - Direct Burial Manual

Advertisement

Quick Links

C
a
b
6
- '
" 0
P
R
O
P
I R
T E
A
R
Y
A
N
D
C
O
N
F
D I
E
N
T
A I
L
T
H
E
N I
F
O
R
M
A
I T
O
N
C
O
N
T
A
N I
E
D
N I
T
H
S I
D
R
A
W
N I
G
S I
T
H
E
S
O
E L
P
R
O
P
E
R
Y T
O
F
S
U
N
R T
E
N
D
S
N I
C
.
A
N
Y
R
E
P
R
O
D
U
C
I T
O
N
N I
P
A
T R
O
R
A
S
A
W
H
O
E L
W
T I
H
O
U
T
T
H
E
W
R
T I
E T
N
P
E
R
M
S I
I S
O
N
O
F
S
U
N
R T
E
N
D
S
N I
C
.
S I
P
R
O
H
I B I
E T
. D
a
n
a
B
e
n
c
h
B
L E
O
W
G
R
A
D
E
F
O
U
N
D
A
I T
O
N
S I
O
M
E
8
- '
i D
e r
t c
8
- '
R T
C I
V
E I
W
B
u
i r
l a
" 0
. P
O
.
B
O
X
1
0
D
E
N
V
E
, R
C
O
3
0
3
7 -
4
4
2 -
S
C
A
E L
1
1 :
9
1
0
5
7
8
0
2
5
0
6
4
7
S
H
E
T E
1
O
F
5

Advertisement

loading
Need help?

Need help?

Do you have a question about the Cabana Bench 8' - Direct Burial and is the answer not in the manual?

Questions and answers

Summary of Contents for SunTrends Cabana Bench 8' - Direct Burial

  • Page 1 " 0 " 0 I B I...
  • Page 3 " 0 " 0 " T " " 6 " 6 " 2 " 2 ) " " 1 " T " B " T " " T " F " T " A " 6 I B I...
  • Page 4 " 0 " T " D " 0 " T " " T " A " 0 " 0 " T " A " 6 " T " B " 2 " 2 ) " I B I...
  • Page 5 " 0 " 0 I B I...
  • Page 7 " 0 " 0 " T " " " 6 X " " 2 ) " " T " B " T " " T " A " 6 " 6 " 0 I B I...
  • Page 8 Cabana Bench Modified 8' - Direct Burial " T " B " T " A " 0 " 6 I B I...
  • Page 9 " 0 " T " D " 0 " T " " T " A " 0 " 0 " 6 " T " A " T " B " 2 " 2 ) " " 4 " 6 " 6 I B I...
  • Page 10 " T " B " T " B " 7 " 8 " T " A " T " B " T " A " F ' I B I...
  • Page 11 Installation Guidelines Cabana Bench 8’-Surface Mount Tools Needed: Ratchet set or wrenches Step 1: Posts and Beam Attach surface mount legs (Part #10) to 3”x3” posts (Part#2) with bolts “A”. Place beam (Part #3) on top of posts (Part #2) making sure bolt holes line up and secure with bolts “A” and column plates (Part #9) Step 2: Seat Plates Attach the (2) seat plates (Part #4) to the inside face of the 3”x3”...
  • Page 12 Installation Guidelines Cabana Bench 8’-Direct Burial Tools Needed: Ratchet set or wrenches, hand level, shovel, wheel barrow. Step 1: Foundation Excavation Excavate holes on level ground for foundation of 2’-0” diameter by 3’-0” deep. Holes spaced at 5’9” to center of each hole (for either a Cabana Bench 8 or Cabana Bench 10).
  • Page 13 Step 7: Gable Ends Secure gable ends (Part #7) to each end of beam (Part #3) with bolts “C”. NOTE: 6”x6” plates to meet at beam end and center of gable end. Step 8: Perlins Attach (5) perlins (Part #8) to gable ends with bolts “D”. Step 9: Fabric Canopy 1.
  • Page 14 PART AND BOLT SCHEDULE - CABANA 8'' SURFACE MOUNT NUMBER QUANTITY DESCRIPTION 3" SQ. STEEL TUBE COLUMN 2" X 3" STEEL TUBE BEAM STEEL SEAT PLATE BENT STEEL BENCH STRAP (OPTION) 3" X 4" NOMINAL DURAWOOD PLASTIC SLATS GABLE END FRAME 1"...
  • Page 15 PART AND BOLT SCHEDULE - CABANA 8' DIRECT BURIAL NUMBER QUANTITY DESCRIPTION 3 1/2" SQ. STEEL POST SLEEVE 3" SQ. STEEL TUBE COLUMN 2" X 3" STEEL TUBE BEAM STEEL SEAT PLATE BENT STEEL BENCH STRAP (OPTION) 3" X 4" NOMINAL DURAWOOD PLASTIC SLATS GABLE END FRAME 1"...