fivalco IPO888 Installation And Operation Manual

Fire protection

Advertisement

Quick Links

Installation and
Operation Manual
Fivalco Ltd | info@fivalco.com | www.fivalco.com
Indicator Post
Fire Protection Products
IPO888 | IPO365 | IPOL888 | WPO999 | WPO365
This manual is also available online.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the IPO888 and is the answer not in the manual?

Questions and answers

Summary of Contents for fivalco IPO888

  • Page 1 Installation and Operation Manual Indicator Post Fire Protection Products IPO888 | IPO365 | IPOL888 | WPO999 | WPO365 This manual is also available online. Fivalco Ltd | info@fivalco.com | www.fivalco.com...
  • Page 2 “The quality goes in before our name goes on” Fivalco Ltd | info@fivalco.com | www.fivalco.com...
  • Page 3: Table Of Contents

    General ............................ 1 Unloading & Transportation ....................1 Storage ............................. 1 Inspection Prior To Installation ....................2 Installation – Vertical type ...................... 2 Installation – Wall type ......................6 Maintenance ........................... 8 Warnings ........................... 8 Fivalco Ltd | info@fivalco.com | www.fivalco.com...
  • Page 4: Indicator Post

    Failure to do so many results in a cracked valve casting and or deterioration of the resilient seat material. Fivalco Ltd | info@fivalco.com | www.fivalco.com...
  • Page 5: Inspection Prior To Installation

    H1 = 2 x number of opening turns of the NRS Gate Valve (in mm) The numbers indicated refer to the gate valve specifications of Fivalco products. Note: Refer to Table 1, Table 2, Table 3, Table 4 and Table 5 for H1distance and debug according to actual conditions.
  • Page 6 Install the 3288 series NRS Gate Valve Size Number of Opening Turns H1 (mm) 94.5 1021 1173 889.5 964.5 1084 1169 1344.5 Bury Depth (min) 50.87” 53.82” 58.54” 61.89” 67.87” Bury Depth (max) 158.35” 161.3” 166.02” 169.37” 175.35” Fivalco Ltd | info@fivalco.com | www.fivalco.com...
  • Page 7 Installation dimensions should follow actual on-site measurements. The above provides a standard installation method. ** Please verify the buried depth before installation. Fivalco will not be responsible for any consequences resulting from incorrect depth measurement. Fivalco Ltd | info@fivalco.com | www.fivalco.com...
  • Page 8 Installation & Operation Manual Indicator Post Fivalco Ltd | info@fivalco.com | www.fivalco.com...
  • Page 9: Installation - Wall Type

    Tighten the two bolts and nuts (Part 6 & 7). Verify that the “OPEN” and “SHUT” target plates (Part 10) are correctly positioned by fully opening and closing the valve using the handwheel (Part 4). Adjust if necessary. Fivalco Ltd | info@fivalco.com | www.fivalco.com...
  • Page 10 Oil the bearing inside the body (Part 16) at least once per year by adding a few drops of oil into the hole located on the top of the operating nut (Part 9). The dimensions are in mm. Fivalco Ltd | info@fivalco.com | www.fivalco.com...
  • Page 11: Maintenance

    If the temperature is too high, the material maybe invalidation and the valve may be broken. If the media does not accord with the regulation of the illumination, it may rot the body, seat or break the sealing, the body may corrode and craze, the media may be leaked. Fivalco Ltd | info@fivalco.com | www.fivalco.com...
  • Page 12 Installation & Operation Manual Indicator Post Fivalco Ltd | info@fivalco.com | www.fivalco.com...

This manual is also suitable for:

Ipo365Ipol888Wpo999Wpo365

Table of Contents