Download Print this page
Hide thumbs Also See for Honeybee350:

Advertisement

Quick Links

INSTALLATION MANUAL
For
Solar optimizers - Honeybee350, Honeybee700
Module Monitors - Scouter350, Scouter700
Smart Junction Boxes - Smartbee350, Smartbee350S
Jiangsu GNE New Energy Technology Co., Ltd.
Service Line:+86 519 8728 1798
Email:
service@gnetek.com
|
Website:www.gnetek.com
Address: 1F/B, No.218, Hongkou Road, Liyang, Jiangsu 213300, CHINA

Advertisement

loading
Need help?

Need help?

Do you have a question about the Honeybee350 and is the answer not in the manual?

Questions and answers

Summary of Contents for GNE Honeybee350

  • Page 1 INSTALLATION MANUAL Solar optimizers - Honeybee350, Honeybee700 Module Monitors - Scouter350, Scouter700 Smart Junction Boxes - Smartbee350, Smartbee350S Jiangsu GNE New Energy Technology Co., Ltd. Service Line:+86 519 8728 1798 Email: service@gnetek.com Website:www.gnetek.com Address: 1F/B, No.218, Hongkou Road, Liyang, Jiangsu 213300, CHINA...
  • Page 2 Refer servicing to qualified service personal. • Do not operate the GNE Technology module optimizer if it has been physically damaged. Check existing cables and connectors, ensuring • Before installing or using the GNE Technology module optimizer they are in good condition and appropriate in rating.
  • Page 3 TABLE OF CONTENTS: 2. Connect Data Acquisition Unit 4. Install Data Acquisition 3. Install Data Acquisition Unit 1. System Diagram (Apidae) (Swarm) to Data Aggregation Device (Beehive) (Swarm) Device (Beehive) 6. Installing Honeybees/ 7. Configuring the system 8. Connecting Modbus 5.
  • Page 4 1 Beehive: up to 5 Swarms and 2000 PV modules • 1 Swarm: up to 400 PV modules • Optimizer: 1 Honeybee350 per 1 PV module 1 Honeybee700 per 2 PV modules Sole Optimizer / Module Monitor Internet Smart Junction box...
  • Page 5 2. Connect Data Acquisition Unit (Swarm) to Data Aggregation Device (Beehive) ① Snip RS485 wire with proper length (Beehive to the middle of PV array ) ② Take down screws and Open the back covers of the Swarm and Beehive ③...
  • Page 6 3. Installing Data Acquisition Unit (Swarm) ①. Place on the racking system in the center of sub-array ②. Link Beehive to the first Swarm with RS485 wire ③. Connect more Swarm (s) in series if needed Connection to next Swarm Last Swarm or single Swarm installation Inbound from Beehive...
  • Page 7 4. Install Data Acquisition Device (Beehive) Notes: 1. The Inbreaking Protection of Beehive is IP20,please install indoor, or please use shielding box 2. Please link to Swarm, Power and LAN port 3. Please check the manu of Beehive to get “FIND 485”to check if Swarm is connected well 电源线...
  • Page 8 5. Mapping ②. Take out power optimizer & write down ①. Plan where to place power the barcode number. Place the sticker optimizers on the map, string list, or construction drawing to match the physical location of the power optimizer Inverter ③.
  • Page 9 6. Installing Optimizers/Scouters/Smartbees ①. Fix power optimizers on the rack or the PV panel with screw ②. Connect a short pair input wires of optimizer or module monitor to PV module, and link the long pair wires to inverter or ③.
  • Page 10 7. Configuring the system online http://gne.gnetek.com New User Operating Guide Returning User Follow wizard instructions...
  • Page 11 8. Connecting Modbus Accessory (Optional) ① ③ GNE New Energy Support: service@gnetek.com +86 519 8728 1798 ② Recommended Settings: • 9600 baud rate • 8 bits data • 1 stop bit • No parity Modbus Modbus Device B Device A...
  • Page 12: Appendix - Product Specification

    Appendix - Product Specification MODEL SPECIFICATION Honeybee350 Honeybee700 Smartbee350 Smartbee350S Scouter350 Scouter700 Max. Input Power 350 W 700 W 350 W 350 W 350W 700W Input Voltage Range 14 ~ 60 Vdc 14 ~ 60 Vdc 14 ~ 60 Vdc...

This manual is also suitable for:

Honeybee700Scouter350Scouter700Smartbee350Smartbee350s