SPC Belgravia Tilevector Installation, Operation & Maintenance Manual
SPC Belgravia Tilevector Installation, Operation & Maintenance Manual

SPC Belgravia Tilevector Installation, Operation & Maintenance Manual

Advertisement

Quick Links

Belgravia Tilevector
Installation, Operation & Maintenance Manual
IOM 71 Issue 3

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Belgravia Tilevector and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for SPC Belgravia Tilevector

  • Page 1 Belgravia Tilevector Installation, Operation & Maintenance Manual IOM 71 Issue 3...
  • Page 2: Table Of Contents

    IOM 71 Issue 3 – Belgravia Tilevector Contents Page General Description Receipt and Preparation Installation Key sizes, dimensions and weights Ceiling Installation Installation into a “T-bar” suspended ceiling 3.2.1 3.2.2 Installation into a plasterboard ceiling 3.2.3 Free hanging Pipework Connection Electrical Information 3.4.1...
  • Page 3: General Description

    IOM 71 Issue 3 – Belgravia Tilevector 1. General Description The Belgravia Tilevector is a self-contained fan convector heater designed for hidden installation into suspended “T-bar” and plasterboard ceilings. The product is in two sizes designated ‘Solo’ and ‘Duo’. 2. Receipt And Preparation...
  • Page 4: Ceiling Installation

    IOM 71 Issue 3 – Belgravia Tilevector 3.2 Ceiling installation Note: Tilevector units must be installed at least Note: Maximum recommended ceiling height 1.8m above floor level. for Tilevector installation is 3.0m. 3.2.1 Ceiling installation Remove any fitted ceiling tiles around the area Lift up the Tilevector, through the T-bar aperture where the Tilevector is to be located.
  • Page 5: Installation Into A Plasterboard Ceiling

    IOM 71 Issue 3 – Belgravia Tilevector 3.2.2 Installation into a plasterboard ceiling Note: Access into the ceiling void is required for installation. Cut a square aperture 575mm x 575mm for a Securely attach the suspension cables and adjust single unit (Solo) and 1175mm x 575mm for a duo...
  • Page 6: Electrical Information

    IOM 71 Issue 3 – Belgravia Tilevector 3.4 Electrical information 3.4.1 Electrical connection Units are supplied with high efficiency EC motors accordance with IET regulations. The terminal and, with the exception of the DUO (ELECTRIC) block is accessible in the void area after hinging unit, require a single phase 230V supply.
  • Page 7: Operation And Maintenance

    IOM 71 Issue 3 – Belgravia Tilevector 4. Operation and Maintenance 4.1 General Warning! Electrically isolate the unit prior to commencing work. 4.1.1 Opening the centre section of the grille The hinged centre section is retained by “press- the centre section will then hinge down. To close to-release”...
  • Page 8: Spares

    IOM 71 Issue 3 – Belgravia Tilevector 4.1.6 Spares list 2A Fuse 33 / 114 Filter (Solo) SK 3974 Filter (Duo) SK 4226 33 / 134 Fan / motor set 35 / 001 Coil (Solo) CM 2020 Coil (Duo) CM 2058 Electric Element (Solo) TILELEC 3.0...
  • Page 9: Disposal

    IOM 71 Issue 3 – Belgravia Tilevector 5. Disposal Units have a heat exchanger from copper separately and in line with WEEE directives. It is tubes and aluminium fins. The units include fan not recommended that the units are disposed of...