Before you begin: We recommend that this product is installed by a qualified tradesperson, Victorian Plumbing Ltd. accept no liability for products incorrectly installed or any damage to the floor, walls, plumbing, vanity cabinet, sink, counter top, or personal injury during installation.
Installation Diagrams are for illustration purposes only. Your Vanity Unit may superficially differ from these drawings however the installation guide steps still apply. Step 1: • Place the ‘Cabinet’ (B) on top of the ‘Metal Frame’ (A). Align the fixing holes of the frame with the holes on the cabinet.
Page 4
Step 4: • Place the unit back onto the wall, ensuring the unit is stable. Secure the unit to the wall by screwing into the ‘Rawl Plugs’ using the ‘Screws’ (E) provided. • Ensure the ‘Cabinet’ is level using a spirit level. E x2 Counter-Top Basin Installation (Not Included)
Page 5
Step 2: Outline • Move the basin away from the installation location. Using an appropriate sized hole saw. Carefully cut-out the markings on the counter top cut-out area, ensuring a clean cut. • Note: It is recommended to Cut-out Area test fit the basin to ensure the basin sits on the counter-top correctly.
Page 6
Furniture Installation This Instruction covers a variety of topics to help with your installation. Drawer Box Adjustment diagrams are for illustration purposes only. Your Vanity Unit may superficially differ from these drawings however the installation guide steps still apply. Drawer Box Adjustment: Y - VERTICAL ADJUSTMENT X - HORIZONTAL...
Cleaning and Maintenance: Drawers, and Runners: These should be wiped out with a damp soapy cloth and wiped dry with a soft cloth as necessary. The roller runners and hinges are lubricated and should not be cleaned with a degreasing agent as this will affect the action of the moving parts. Never lean on partially or fully opened drawers in order to gain access to the units.