BARRON Beam Installation Instructions

Ducts and vents in beams

Advertisement

Quick Links

Beam
Ducts and Vents in Beams
Installation Instructions
General Tools and Materials:
Duct
Vent
Materials
Register
Installation Overview
Dry Fit Beam
1
Dry fit the duct work inside the beam to ensure
adequate space and clearance for the duct work and
mounting blocks needed to install the beam.
Register
Jig Saw with
Box
Finish Blade
Questions? Our Customer Experience & Design Support Team is here
to assist you Monday-Friday from 9AM to 5PM EST at (800) 651-4223.
Screw Gun /
Safety
Drill Driver
Glasses
& Bits
Duct Tape
Pencil
WARNINGS
:
Be sure to obey all safety rules and
recommendations set forth by tool
manufacturers.
Follow local building and fire codes.
Duct work needs to be connected
prior to installing the beam and vent.
Wear safety glasses during the entire
installation process.
Beams are for decorative purposes
only. They are not to be used
for structural support, bracing or
suspension of objects.
1

Advertisement

loading
Need help?

Need help?

Do you have a question about the Beam and is the answer not in the manual?

Questions and answers

Summary of Contents for BARRON Beam

  • Page 1 Dry Fit Beam Dry fit the duct work inside the beam to ensure adequate space and clearance for the duct work and mounting blocks needed to install the beam. Questions? Our Customer Experience & Design Support Team is here...
  • Page 2 2. Cut out the vent opening using a jig saw with a finish blade. Insert Register Box and Vent Register Connect Duct Work Connect duct work prior to completing the beam installation. Install Beam Install the beam based on the appropriate installation guide (available on our website). Ensure that all duct work is connected prior to gluing and screwing the beam in place.