Download Print this page

RCBS PRO-MELT Product Instructions

Electric lead furnace

Advertisement

Quick Links

PRO-MELT
ELECTRIC
LEAD FURNACE
P R O D U C T
I N S T R U C T I O N S

Advertisement

loading
Need help?

Need help?

Do you have a question about the PRO-MELT and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for RCBS PRO-MELT

  • Page 1 PRO-MELT ELECTRIC LEAD FURNACE P R O D U C T I N S T R U C T I O N S...
  • Page 2 WARNING: Melting lead and casting lead objects will expose you and others in the area to lead, which is known to cause birth defects, other reproductive harm and cancer. REDUCING EXPOSURE: Lead contamination in the air, in dust, and on your skin is invisible.
  • Page 3: Record Keeping

    Labels for this purpose are packed with SPEER bullets. Since RCBS has no control over the choice of components, the manner in which they are assembled, the use of this product, or the guns in which the resulting ammunition may be used, no responsibility, either expressed or implied, is assumed for the use of ammunition reloaded with this product.
  • Page 4 Set the thermostat at its lowest temperature and turn on the Pro-Melt. The pilot light located in the on-off switch will indicate when there is power to the element. After the Pro-Melt has been on for approximately 15 minutes (the pilot light will go on and off), set the thermostat at 650°F.
  • Page 5 PART# DESCRIPTION 81101 Furnace body 81103 Base 81104 Handle 81107 Handle fulcrum 81108 Round head screw 81114 Nozzle shut-off pin 81115 Round head screw 81110 Adjustment bracket 81112 Hex nut 81111 Socket head cap screw 81109 Socket head cap screw 81116 Mould guide rod 81117...
  • Page 6 1-800-533-5000 (US or Canada) or 530-533-5191 Hours: Monday - Thursday, 6:30am - 3:00pm (hours may vary) e-mail: rcbs.tech@atk.com • www.rcbs.com RCBS • 605 Oro Dam Blvd. • Oroville, CA 95965 CCI • SPEER • RCBS OUTERS • RAMLINE • ORBEX • FEDERAL...