Summary of Contents for Hahn & Sohn H IG 2000

  • Page 1 OPERATING INSTRUCTIONS WARRANTY LETTER H IG 2000 H IG 3000 H IG 3500 H IG 3500E H IG 7000...
  • Page 3: Home

    OPERATING INSTRUCTIONS FOR INVERTER POWER UNITS: H IG 2000, H IG 3000, H IG 3500, H IG 3500E, H IG 7000. Home Thank you for your trust and congratulations on making the right choice. The power plant you have purchased has: - a modern, four-stroke, fuel-efficient petrol engine, - robust, aesthetic construction.
  • Page 4: Table Of Contents

    CONTENTS Home......................3 1. Safety instructions ..................5 2. Design elements of the power plant............7 3. Pre-commissioning operations...............14 4. Commissioning of the power plant ............17 5. Operation of the power plant..............19 6. Switching off the power pack ..............24 7. Service and inspections .................24 8.
  • Page 5: Safety Instructions

    1. Safety instructions WARNING Read the operating instructions carefully. Follow the instructions contained therein and use the equipment correctly. This will ensure the correct functioning of the power pack and prevent damage to it. WARNING The exhaust contains compounds that are toxic to humans and animals.
  • Page 6 WARNING Do not connect the power pack directly to the domestic mains. Such wiring may cause the power pack to explode, burn or set the wiring on fire. The power generator can only supply the domestic mains if the mains is adapted and the power generator is connected to the switchboard in such way that it will be disconnected immediately when the mains supply is restored.
  • Page 7: Control Panel

    2. Design elements of the power plant H IG2000/3000 (using H IG2000 as an example) Handle Tank venting Fuel filler plug Control panel Manual starter Side cover Back cover Silencer Spark plug cover Control panel Low oil level warning light Overload indicator light AC output indicator light SMART switch (ESC)
  • Page 8 H IG3500 Fuel filler plug Handle Control panel Cover Accumulator Brake Manual starter Cover Silencer Oil drain screw Oil filling plug Air filter Carburetor Spark plug Left view of the cover Gauge for checking the oil level Option 1 Control panel 230V AC socket AC mains switch Digital display...
  • Page 9 H IG3500E frame, fuel level gauge, filler plug, fuel , control panel, grounding clamp, switch (start/stop/fuel valve/ choke), the manual start handle, view of the cover, the muffler, oil drain screw, oil filler plug, air filter, carburetor, a spark plug. Control panel Oil shortage warning light, overload indicator light,...
  • Page 10 2.3. Check 2.3.1. 3-in-1 switch 1. Work switch in "OFFposition position "1". Ignition off, fuel sealed. Engine will not start. 2. Work switch in "ON" position position "2". Ignition on, fuel open, choke off. 3. Work switch in position "CHOKE" position "3".
  • Page 11 During normal operation, the button is used to switch screens displaying data such as voltage, current, power, run time. In case of emergency situations: 1. For> - AC or DC voltage too high, the display shows the AC or DC mark (alternatively, the AC or DC mark and a numeric value), 2.
  • Page 12 Procedure: 1. Switch off all appliances and stop the engine. 2. Reduce the load on appliances. 3. Check air inlet clearance. 4. Start the engine again. 2.3.6. AC indicator light (green) The light will come on when the engine starts if the voltage parameters are correct. 2.3.7.
  • Page 13 2.3.9. Parallel socket (optional) The parallel socket allows the parallel connection of two power units of the same type and power (e.g. H IG3500 from H IG3500E) with special cables in case of the need to supply appliances with a higher current consumption. (In case of parallel operation, the rated power is 5.6 kVA and the rated current is 60A/100V, 50A/120V, 26A/230V.) 1.
  • Page 14: Pre-Commissioning Operations

    3. Pre-commissioning operations ATTENTION Before each use of the equipment, carry out the check only with the engine stopped. 3.1. Check the fuel level The recommended fuel is unleaded petrol Pb95/E5. If the fuel level is low, top up to the upper level. Do not use any fuel additives. Do not mix petrol with engine oil or diesel fuel.
  • Page 15 If the oil level is high, drain the excess using a syringe with a rubber hose. oil quantity: H IG 2000 : 0.35L, H IG 3000/3500/3500E: 0.6L 3.3. Check the air filter Unscrew the covers (1) and remove the cover (2).
  • Page 16 Remove the agitation filter cover and remove the filter cartridge (3). Clean the filter cartridge (if OK) with solvent and then dry or replace with a new one. After cleaning/replacing the oil filter cartridge, wet it and squeeze out the excess oil.
  • Page 17: Commissioning Of The Power Plant

    4. Commissioning of the power plant ATTENTION The power unit can be used with rated load in normal climatic conditions: ambient temperature 25° C, barometric pressure 100 kPa, relative humidity 30%. The power output of the power unit according to temperature, altitude (lower air pressure at higher altitudes) and humidity.
  • Page 18 Option 1: For electric start, switch the engine switch on the control panel to the "ON" position or press START. If the engine does not start within 3 seconds, release the START button and wait 10 seconds before trying again - this will prevent the starter from burning out.
  • Page 19: Operation Of The Power Plant

    5. Operation of the power plant ATTENTION The duration of use of the power pack with maximum load must not exceed 30 minutes. Do not use full power for continuous operation. Do not exceed any limits specified in the instructions. Do not modify the power unit or use it for any purpose other than intended use.
  • Page 20 5.1. Connecting appliances to AC sockets ATTENTION Before connecting electrical equipment to AC outlets, make sure they are switched off. Make all connected electrical equipment, including wires and plugs, they're in good . Make that the total load is less than the rated capacity of the power pack. Make sure load current is less than the rated current of the socket.
  • Page 21 First start the engine and connect the power pack to the battery for charging. Before starting to charge the battery, make sure that the DC protection is switched on. 1. Start the engine. 2. Connect the red wire of the battery charger to the positive (+) terminal of the battery.
  • Page 22 5.3 Parallel AC operation (optional) Before connecting the device to both power centres, make sure that it is in good condition and that its electrical parameters do not exceed those of the socket. During parallel operation, the ESC switch on both power units must be in the same position.
  • Page 23 The following table shows the performance of the device when used alone. Effect (efficiency 0.85) Rated voltage 12 V Rated current 8 A Example: Rated power of the power plant Effect The overload light will illuminate if the total power exceeds the usage range. ATTENTION Do not overload the power pack.
  • Page 24: Switching Off The Power Pack

    6. Switching off the aggregate 1. Switch off all appliances. 2. Disconnect all appliances. 3. Switch the ESC switch to the "OFF" position. 4. Switch the 3-in-1 switch to the "OFF" position. 7. Service and inspections The aim of regular inspections and adjustments is to keep the power plant in the best possible condition.
  • Page 25 X(2) - means that the activity must be performed at the Warrantor's location or at an Authorized Regional Representative of the . How often to perform? Every twelve The first Every six months or month or months or Activities Interval 300 mth 100 mth 20 mth...
  • Page 26 Head of the Cleaning, more X (2) frequently if cylinder necessary Check, adjust if The will of the X (2) necessary valves Facilities/Compani Inspection, repair if X (2) necessary Locations where faults have been found during use 7.1 Checking the spark plug Unscrew the screws (1), remove the remove the cover of the power pack (2) spark plug cable from the spark plug...
  • Page 27 Check the electrode spacing using a pair gauge. The distance should be about 0.6 - 0.7 mm. ATTENTION Recommended spark plugs: BPR6ES/BP6ES (NGK) F7RTC/F7TC Screw in the spark plug using the spanner with a torque of approx. 20 Nm. Fit the cable end to the spark plug and the cover.
  • Page 28 7.4. Oil change Place the power pack on a flat surface and warm up the engine for a few minutes. Unscrew the screw (1) and remove the engine oil sight glass (2). ATTENTION Remember to turn the ignition switch to the OFF position and close the fuel tap before replacing.
  • Page 29 Remove the oil filler plug (4). Place the used oil container under the engine, unscrew the oil drain screw, drain the oil from the oil tank. Check the condition of the oil fill plug (4), O-ring (5), oil drain plug (6) and its seal (7). If any of the parts are damaged, replace them with new ones.
  • Page 30: Transport And Storage

    Remove dirt from the silencer screen, e.g. with a wire . Common USDA Check the muffler screen and spark arrestor, replace if necessary. Install the muffler spark arrestor. ATTENTION Never use an engine without a proper muffler with a spark arrestor in the woods! This can cause a fire.
  • Page 31 3. Start the engine and let it run until stops. The engine will stop after about 20 minutes after the fuel has been used. ATTENTION Do not connect any electrical equipment at this time - work without load. The running time of the engine depends on the amount of fuel in the tank. DANGER Gasoline is flammable, avoid sparks in its vicinity, avoid contact of gasoline with fire.
  • Page 32 ATTENTION Store the power pack in a sheltered location to protect it from direct atmospheric influences. To keep the equipment in good condition, clean it of dust and other dirt and preserve it after work. Switch off the equipment and allow it to cool completely before transporting and storing.
  • Page 33: Possible Problems And Solutions

    9. Possible problems and solutions Engine won't start Is there fuel in the tank? Fill up with Pb95/E5 petrol. Is the engine ignition switch in the Switch the ignition switch to the ON ON position? position. Top up with SAE 15W-40 oil. Is the oil level too low? YES Clean the fuel filter.
  • Page 34 The power plant is not working (does not produce current) Check if the AC output Stop the engine and light is on? start it again. Is the overload light on? Take device authorised Hahn & Sohn GmbH service centre. Check power appliances, if it is too consu...
  • Page 35: Technical Parameters

    10. Technical parameters Model H IG2000 H IG3000 Type Inverter Frequency 50 Hz Voltage 230 V Generator Maximum performance 1.8 kVA 2.5 kVA Rated power 1.6 kVA 2.3 kVA Effect DC output 12V/8A 12V/8.3A Type Single-cylinder, air-cooled, OHV 79 cm³ 182 cm³...
  • Page 36 Model H IG3500 H IG3500E H IG7000 Type Inverter Frequency 50 Hz Voltage 230 V Generator Maximum performance 3.3 kVA 7.0 kVA Rated power 3.0 kVA 6.0 kVA Effect DC output 12V/8A Single-cylinder, 4-stroke, air-cooled, OHV Type 212 cm³ Stroke volume Fuel Petrol Pb95/E5 Engine...
  • Page 37: Electrical Diagrams

    11. Electrical diagram...
  • Page 38 H IG 3000, H IG 3500, H IG 3500E...
  • Page 39 Electrical diagram...
  • Page 40: Ec Declaration Of Conformity

    12. Declaration of conformity Electric power plant H IG 2000 Ing. Richard Janovský In Cham on 08.03.2019...
  • Page 41 H IG 3000 power plant Ing. Richard Janovský In Cham on 08.03.2019...
  • Page 42 Power Plant H IG 3500, H IG 3500 E Ing. Richard Janovský In Cham on 08.03.2019...
  • Page 43 Electric power plant H IG 7000 Ing. Richard Janovský In Cham on 08.03.2019...
  • Page 44: Warranty Letter

    WARRANTY LETTER The equipment is subject to warranty if purchased from Hahn & Sohn GmbH or an authorized regional representative of Hahn & Sohn GmbH. The warranty is valid for 1 year from the time of purchase in the case of commercial use, 2 years in the case of consumer use.
  • Page 45 -oil service during the warranty period is paid by the user. Failure to document the above activities will void the warranty. Documentation of the above inspections, including a record of the types of oils, filters, service stamp and date of service, must be made each time in the "Warranty Repairs and Out-of-Warranty Service"...
  • Page 46 INSPECTIONS, ADJUSTMENTS AND CHECKS Number of Date and Description of inspection, adjustment, repair working signature of (range of activities) hours service technician...
  • Page 47 INSPECTIONS, ADJUSTMENTS AND CHECKS Number of Date and Description of inspection, adjustment, repair working signature of (range of activities) hours service technician...
  • Page 48 Central distributor and warranty provider Hahn & Sohn GmbH Auf der Schanze 20 93413 Cham Tel: +490 9944 890 9 896 www.hahn-power.de Hahn a syn s.r.o. Lelkova 186/4, 747 21 Kravaře www.hahn-power.cz...

This manual is also suitable for: