Sheds Direct Ireland The Premium Apex Shed Owner's Manual

Metal garden shed 6ft x 5ft

Advertisement

Quick Links

Metal Garden Shed
OWNER'S MANUAL
Instructions for Assembly
The Premium Apex Shed
Requires two people and takes at least 1-1.5 hours for
installation. Ridge Reinforced Walls
Built in Vents
6ft x 5ft

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the The Premium Apex Shed and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Sheds Direct Ireland The Premium Apex Shed

  • Page 1 Metal Garden Shed OWNER'S MANUAL Instructions for Assembly The Premium Apex Shed 6ft x 5ft Requires two people and takes at least 1-1.5 hours for installation. Ridge Reinforced Walls Built in Vents...
  • Page 2: Before You Start

    BEFORE YOU START Owner's Manual Prior to installation, it is important that you contact your local government authority to determine if building approval is required. Study and understand this owner's manual. In this document, you will find important and helpful information that will make your construction easier and more enjoyable.
  • Page 3: Plan Ahead

    5ft x 6ft shed, your base should be at least 6ft x 7ft. The base can be constructed of concrete, tarmac, hardcore stone or Sheds Direct Ireland's 'ShedBase'. A damp-proof membrane must be build under your base to reduce condensation formation.
  • Page 4 STEP ONE: CHECK OFF ALL THE PARTS Qty. Qty. PART PART 1260mm 1850mm 1260mm 1850mm 1660mm 643mm 1660mm 643mm 722mm 722mm 1850mm 1850mm 1718mm 1784mm 703mm 703mm 1850mm 1788mm 1788mm 1220mm 1620mm 220mm...
  • Page 5 Qty. Qty. PART PART 1812mm Qty. PART 75mm Qty. PART 1302mm 1339mm 716mm...
  • Page 6: Overview Of Parts

    OVERVIEW OF PARTS...
  • Page 7: Assembly Overview

    ASSEMBLY OVERVIEW...
  • Page 8 ASSEMBLY OVERVIEW...
  • Page 9: Wall Assembly

    WALL ASSEMBLY Qty. PART Step 1: Side Walls (2X) Ensure that you use the S3 washers on the screws / bolts...
  • Page 10 Qty. PART Step 1: Side Walls (2X) -10-...
  • Page 11: Step 2: Rear Wall

    Qty. PART Step 2: Rear Wall -11-...
  • Page 12 Qty. PART Step 2: Rear Wall -12-...
  • Page 13: Step 3: Front Wall

    Qty. PART Step 3: Front Wall The corner piece (Part 8), should sit on the outside of the Part 6 & Panel P3 -13-...
  • Page 14 Qty. PART Step 3: Front Wall -14-...
  • Page 15 Qty. PART Step 4: Wall Assembly Above intermediate below -15-...
  • Page 16 Qty. PART Step 4: Wall Assembly Above below -16-...
  • Page 17 Qty. PART Step 4: Wall Assembly -17-...
  • Page 18 Qty. PART Step 5: Gable & Beam Assy -18-...
  • Page 19 ROOF BEAMS Qty. PART Step 5: Gable & Beam Assy -19-...
  • Page 20 Ensure that you use the S4 washers on the screws / bolts Qty. PART Step 6: Roof f installation -20-...
  • Page 21: Step 7: Door Assembly

    Qty. PART Step 7: Door Assembly -21-...
  • Page 22 Qty. PART Step 8: Installing the door and lock -22-...
  • Page 23 Qty. PART Step 8: Installing the door and lock Qty. PART 75mm -23-...
  • Page 24 Step 8: Installing the door and lock -24-...
  • Page 25 Qty. PART Step 8: Installing the door and lock -25-...
  • Page 26 Qty. PART Step 8: Installing the door and lock -26-...
  • Page 27 Lock failed If the door gap is too wide and the lock fails, you can use the following methods to adjust. external external 7&8 Loosen the F1&F2 screw Loosen the F1&F2 screw internal internal external 7&8 7&8 Move 7&8# to the left Move 7&8# to the left or right and lock F1 or right and lock F1&F2...
  • Page 28 FLOOR SUPPORT FRAME Qty. PART 1302mm 1339mm 716mm SLOT INTO PLACE OR SCREW INTO FRAME.

Table of Contents