E-On GENESIS EBR-P48192EDA1 Manual

9.8 kwh 48v residential energy storage system

Advertisement

Quick Links

e-On GENESIS™
9.8 KWh 48V Residential
Energy Storage System
Date:
08/29/2022
Version: V1.1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the GENESIS EBR-P48192EDA1 and is the answer not in the manual?

Questions and answers

Summary of Contents for E-On GENESIS EBR-P48192EDA1

  • Page 1 GENESIS™ 9.8 KWh 48V Residential Energy Storage System Date: 08/29/2022 Version: V1.1...
  • Page 2: Table Of Contents

    2.3 Appearance ............7 This document describes the application scenarios, installation, 2.4 Technical Parameters........8 electrical connection, commission and troubleshooting of the e-On Genesis 9.8 KWh Energy Storage Battery (hereinafter simply put as battery). Before installing and operating the battery, please ensure 3 Installation.
  • Page 3: Safety

    1. Safety 1.1 Warning Label Battery is heavy enough to cause severe Do not dispose with household trash. injury. Always use caution when lifting. Recyclable Do not reverse polarities. EU Certification Do not expose battery to open flames. Risk of electric shock Operate as specified within user’s manual.
  • Page 4: Precautions

    1.2 Precautions: 1.3 Emergency Responses: Risk of electrolyte leakage Nameplate Do not subject battery to strong impact. Do not crush or puncture battery. Do not drop battery. Do not open or manipulate batteries. Released electrolyte may be harmful to the skin and eyes. Risk of fire Do not expose battery to direct sunlight.
  • Page 5: Emergency Response Measures

    Description and recommended actions: Event 1.4 Storage Safety Leakage Inhalation: leave the contaminated area immediately. Place battery according to labels on packing case. Swallowing: induce vomiting. Do not put battery upside-down or sideways. Contact with eyes: flush eyes with flowing Store batteries in a place free from direct sunlight and water for 15minutes.
  • Page 6: Transportation Safety

    Transportation Safety Battery has cleared UN38.3 (Section 38.3 of the sixth Revised Edition of the Recommendations on the Transport of Dangerous Goods: Manual of Tests and Criteria) and SN/T0370.2-2009(Part 2:Performance Test of the Rules for the Inspection of packaging for Exporting of Dangerous Goods).
  • Page 7: Introduction To Product

    2. Introduction to Product 2.1 Intended Purpose The e-On Genesis is a 48V 9.8kWh LiFePO4 energy pack. It has a 48V battery module as the main power B A T B A T supply unit which is composed of 64Ah cells in 3 parallel and sixteen series connections (3P16S).
  • Page 8: Function

    Monitoring: Measure the voltage and temperature of cell, and the voltage and current of battery. SOC estimate: Indicates the amount of remaining charge as a percentage. Alarms: over-voltage, under-voltage, over-current, over- temperature and under-temperature. LED5 Protection: Protects against over-voltage, under-voltage, over-current, over-temperature, under-temperature, cell faults and hardware failure.
  • Page 9: Technical Parameters

    2.4 Technical Parameters Battery Capacity 192Ah Battery Energy 9.83kWh Usable Capacity 173Ah@90% DOD Usable Energy 9.0kWh@90%DOD Nominal Voltage 51.2V 43.5" Operating Voltage 44.8V to 57.6V Max. Charging Current 0A (<-14°F) (temperatures refer to 32A (-14°F≤ T<32°F) cell surface temperature) 48A (32°F≤ T<41°F) 96A (41°F≤...
  • Page 10: Installation

    3. Installation Cycle Life(25℃) ≥ 6000 cycles @ 60%EOL > 95% 3.1 Basic Installation Requirements 94.5% SOH 50% or 13 years, whichever E O L Battery can be installed indoors or outdoors. Ensure the following conditions are satisfied: A deviation of-5°≤θ≤ 5°is allowed for both wall installation and floor comes first.
  • Page 11: Installation Required Tools

    Ensure direct contact between battery shell and Wall Wall ambient air. 3.2 Installation Required Tools Ground Ground Ground Wire stripper Crimper Drill Caution Do not place battery upside-down or flat shown above. Screw driver Pencil Hydraulic Crimper Build sunshade & rain shelter to avoid direct exposure to sunlight and rain.
  • Page 12: Installation Procedures

    After opening the package, ensure deliverables are complete. If there are any missing components, please contact your e-On representative. Check and confirm: the e-On Genesis is powered off and breaker is open before taking any further steps. Components List RJ45 connector...
  • Page 13 Rotate the left latch leftward and the right latch rightward until Using a 1/4" alloy drill bit, drill in the spots perpendicular to the e-On Genesis*. Install battery from the top identified in step1 and have at least a 2.5" drilling down and lock the connection part of battery with the support depth.
  • Page 14: Floor Standing Installation

    CAUTION CAUTION Plug #1 and Plug #2 are identical, allowing for mixed use. Minimum wall clearance of 5 inches from front to rear of battery required. In order to maintain a stable connection between the battery and bracket visually inspect the two 3.3.2 Floor Standing Installation joints to ensure their connection is fixed.
  • Page 15: Electrical Connection

    Using a 1/2" alloy Step 1.5: Connect battery: Item No. Definition Item No. Definition Item No. Definition drill bit, drill two holes in spots measured and marked Link- C O M - C A N H PCS 1 PCS-RS485-B Link C O M - C A N H in step 1.
  • Page 16 Tighten up sealing, sealing nut and joint sleeve. Step 2. 2: Assemble power cables. Step 2. 3 : Assemble Network Cable A 1. Prep cable sheaths 1/2", with orange positive cable and black negative cable. Insert sealing sleeve and sealing nut along the cable as shown.
  • Page 17 3. Crimp RJ45 plug with a wire crimp tool. Crimp the RJ45 plug with a wire crimp tool. 4. Connect RJ45 plug with joint sleeve, and tighten sealing, sealing nut and joint sleeve. Connect RJ45 plug with joint sleeve, and tighten sealing nut and joint sleeve.
  • Page 18: Installation Steps Under Parallel Connection

    5. Installation Steps Under Step 2.5: Insert power cables and network cable into battery terminals Parallel Connection: Measure battery voltage with a multi-meter to ensure the voltage output is 0V when in power-off mode. Plug one end of the power cables that have been made in Step 3.1: Install battery Section 4.2, step 2, into DC breaker, and plug the other end Power on batteries under zero load, measure voltage of all...
  • Page 19 Step 3.5: Step 3.4: Insert power cables into battery terminals. Insert network cables into battery terminals. Assemble battery power cables based on Section 4.2 Assemble network cables based on Section 4.2 Step 3. Connect two batteries with Network Cable B, and connect battery and PCS Step 2.
  • Page 20: Led Indicators

    6.1 LED Indicators WARNING Ensure batteries in parallel connection are from the same batch, model, and manufacture. Do not mix old batteries with new batteries. Batteries with less than 300 cycles are defined as new batteries. 6. Powering Battery ON/OFF LED Indicator Light Display Logics Status Description...
  • Page 21: Troubleshooting

    Application Parallel or single SOC Indication 6.2 Troubleshooting Mode checks application LED1 LED2 LED3 LED4 LED5 LED Indicator light Display Logics success mode Status Description Description Light Indication Battery Status LED1 LED2 LED3 LED4 Bi-color LED 5 ● Charge 0%-25.0% SOC (blue/red) ●...
  • Page 22 Press POWER button of any If RUN and SOC lights on both batteries 6.3 Powering Battery ON battery for two seconds and observe power ON, and the RUN the LED indication on the two panels. lights on both batteries flicker five times, Power on single battery by pressing POWER button both batteries have powered on successfully and communication between batteries is confirmed.
  • Page 23: Maintenance

    7. Maintenance: 7.3 Firmware Upgrade Step1:Install software 7.1 Preparation Choose file "BMS Installation package.zip" and decompress file. Battery replacement should be conducted by qualified professionals in accordance with state, local, and federal Enter "BMS Installation package regulations. \Volume" Prepare tools such as safety gloves, phillips-head driver and socket wrench.
  • Page 24: Troubleshooting

    2.. Choose “CANalyst-II” for device type and “Extend” for Frame Type, set “500Kbps” baud rate. Keep other default parameters. Click “OK”. 3. Choose target upgrade file. 4. Click “Start to Upgrade”. 5. Upgrade is successful when progress bar reaches 100%. T: 1-800-636-3616 E: info@e-onbatteries.com W: https://www.e-onbateries.com...