Page 2
ASSEMBLY Tools needed: Two adjustable wrenches. Step 1 POSITION AND FILL BASE • Position base on flat ground near pool edge. • Do not position so that the front of base overhangs the pool edge. • Lower hose into fill hole on top of base and fill with water until base overflows.
Page 3
(D2) (E3) (E4) (C2) Step 4 Backboard/Rim Assembly (2 Persons Recommended) • Attach the 2 backboard supports (D1) smooth side out at the top of board by running 4 - 5/16” X 2” flanged head bolts (D2) thru bracket and loosely secure to board. •...
Page 4
Step 5 LOCK POST TO BASE (See figure J.) • Lower post into base (with hole in post facing towards back of base) until it rests on pool deck. It may be necessary to force post through the first time. (See figure K.) •...
Need help?
Do you have a question about the Splash & Slam CLEAR and is the answer not in the manual?
Questions and answers