Failure to comply with any of the above requirements may result in injury to personnel or damage to equipment. PowerPlus Energy shall not be liable for any loss of life or damage caused by failure to comply with the requirements of this document and user manual.
Dimension 210mm 210mm 750mm 1540mm Installation Location No direct sunlight No rain exposure No snow exposure Direct sunlight Rain exposure Snow exposure...
Pre - Operation Inspection Result Checking Items ① The installation location meets the manual & standard's requirements. The system has been securely installed. ② ③ Sufficient space for heat dissipation. No objects are left in or on the system. ④ System wiring is connected and tightened.
Installation Avoid water and electricity when drilling, bit size φ8mm, drilling depth 40mm. Expansion 2.8 N.M Bolts 5 N.M Expansion Bolts 5 N.M Refer to the electrical connection section for wiring...
Port Instruction Items Name GRID BACKUP DRMO / METER PARALLEL ON-OFF PV SW GRID BREAKER BACKUP BREAKER WIFI BAT BREAKER PE Wiring 2.8 N.M PE Cable 3 PE Cable 2 PE Cable 3...
Page 8
PV Connection Positive metal terminal Positive connector PV-CZM-22100/19100 Ensure that the cable Negative connector Negative metal terminal cannot be removed Measuring voltage Use the open spanner to tighten the lock nut. If the spanner slips during tightening, it indicates that the lock nut is PV-MS-HZ tightened open spanner...
The dry contact is connected based on customer requirements Dry Contact Connect with weak current Group Definition DRY_1_NC 1 2 3 4 5 6 7 8 DRY_1_COM RJ45 DRY_1_NO CT / Smart meter / DRM0 Smart meter 485,DRM0 signal, external CT Group Definition I_CT_IN-...
Page 12
Network cable (8pin) The parallel ports are RJ45 terminals and are connected using conventional 8 pin network cables CT / Meter Installation RX-7013Plus L - Line GRID Backup Loads Inverter The CT with the "GRID" label is attached to Grid the L line of the power grid.
LED Indicator Display Logic LED2 LED3 Bi-colour LED1 System Status System Information Grid/Gen Battery LED4(Green/RED) Wifi/Ethernet/Fault ▲ ▲ ▲ ▲ Power on ■ ■ ■ ■ Power off Normal Information Promote update Promote update success ★ ★ ★ ★ ■ ■...
Page 14
SOC Led lndicate Charging ● ● ● ● ● flash 0-20% 21-40% flash 41-80% flash flash 61-80% 81-100% flash Normal ● ● ● ● ● 0-20% 21-40% 41-80% 61-80% 81-100% Notice If the startup fails, refer to "Troubleshooting" in the user manual. For details about LED indicators, refer to the user manual.
Page 15
Description Of Energy Storage Capacity Inverter*1 13kWh Battery*4 RX7013Plus Base*1...
Page 16
All Downloads Warranty Registration App Download The size and parameters of the product are subject to change without notice. Rev 16.05.2024.
Page 17
Helping power possibilities. One system at a time. In Technical Partnership with Redx PowerPlus Energy Pty Ltd 2 Koornang Road Scoresby, Vic, 3179 Australia +61 3 8797 5557 info@powerplus-energy.com.au powerplus-energy.com.au...
Need help?
Do you have a question about the WHISPR-7 and is the answer not in the manual?
Questions and answers