Page 2
Compact CARAVAN STOR USI 025 06-10-2016 Before Assembly It is important you have a level firm YOU WILL NEED base for your unit. This should be constructed from concrete, tarmac or flags and be a minimum of 50mm Recommended: (1.9”) deep. Powerdriver Stor Measurement Silicone Sealant...
Page 3
step by step Compact CARAVAN STOR step 1 step 2 X 18 Position RH (right hand) rear panel 2 into the groove on the Position RH side panel 3 into the groove on the base panel 1 and up to base panel 1 ensuring that the holes are aligned.
Page 4
Attach the fascia 7 across the front of the unit as pictured. Screw into both Lift the roof panel 6 onto the unit, covering the other panels and fascia. side panels. The front of the roof panel can be identified by the SafeStor logo. Screw into place using the single screw holes. step 8...
Need help?
Do you have a question about the SFSC003 and is the answer not in the manual?
Questions and answers